|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 8/21/2013 Measured TD: 8402 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 8/21/2013 | Wellbore Permit | | Permit #: | 19980354 | Expiration Date: | 4/9/1999 | Proposed Depth/Form: | 8620 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499,232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 2/5/1974 | Spud Date: | 10/29/1973 | Spud Date Is: | ACTUAL | Measured TD: | 8402 ft. | Measured PB depth: | 8358 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | SP-IES, FDC-GR-CALIPER | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 216 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 216 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8401 ft., Weight: 11.6/10.5, Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7632 ft., Bottom: 8401 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5909 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 5900 ft., Bottom: 5930 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 5600 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 5434 ft., Bottom: 5600 ft., Determination Method: CALC | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 819 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 349 ft., Bottom: 819 ft., Determination Method: CALC | Casing: | String Type: OPEN HOLE, Hole Size: 3.625 in., Size: , Top: , Depth: 8481 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Casing: | String Type: S.C. 1.3, Hole Size: , Size: , Top: , Depth: 5440 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 5240 ft., Bottom: 5440 ft., Determination Method: CALC | Additional Cement: | String Type: 1ST , Top: 5908 ft., Depth: 5912 ft., Bottom: 5912 ft., Sacks: 150, Method: CALC | Additional Cement: | String Type: 1ST , Top: 5912 ft., Depth: 5930 ft., Bottom: 5930 ft., Sacks: 150, Method: CALC | Additional Cement: | String Type: 1ST , Top: 349 ft., Depth: 819 ft., Bottom: 819 ft., Sacks: 200, Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | J SAND | 8274 ft. | | N | N | DAKOTA | 8443 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 8/21/2013 Interval Top: 8443 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 7/25/1998 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| No Perforation Data was found for formation DKTA. |
|
Formation DK-J Formation Classification: GW Status: CM - 8/21/2013 Interval Top: 8280 ft. Interval Bottom: 8307 ft. Completed Information for Formation DAKOTA-JSND | 1st Production Date: | 7/25/1998 | Choke Size: | | Formation Name: | DAKOTA-JSND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 2/5/1974 | Treatment Summary: | DEEPENED TO DAKOTA AND COMMINGLED WITH JSAND |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6569 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/10/1998 | Test Method: | FLOWING | Hours Tested: | 2 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 1 | CALC_GOR | 28000 | CALC_MCF_GAS | 336 | CASING_PRESS | 400 | MCF_GAS | 28 | TUBING_PRESS | 350 |
| Perforation Data: | Interval Top: | 8280 ft. | # Of Holes: | | Interval Bottom: | 8307 ft. | Hole Size: | |
|
Formation JSND Formation Classification: GW Status: AB - 8/21/2013 Interval Top: 8274 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/5/1974 | Treatment Summary: | "SAND PLUG DEPTH-8442" "2 SACKS SAND ON TOP:6 SX 20/40/FRAC SAND" |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 16 | BBLS_OIL | 34 | MCF_GAS | 1801 |
| Perforation Data: | Interval Top: | | # Of Holes: | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 08/21/2013 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|