|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/22/2014 Measured TD: 8173 ft. Vertical TD: 8144 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/22/2014 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/12/2012 | | Proposed Depth/Form: | 8180 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N/2NE/4 | | Formation And Spacing: | Code: SUSX , Formation: SUSSEX , Order: , Unit Acreage: 80, Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 651 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 651 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 4784 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 4784 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 3.875 in., Size: 2.875 in., Top: , Depth: 8173 ft., Weight: 6.5 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 4700 ft., Bottom: 8173 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/1/1999 | | Spud Date: | 8/29/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 8173 ft. | Measured PB depth: | | | True Vertical TD: | 8144 ft. | True Vertical PB depth: | | | Log Types: | CDCNGR, ISGR, CBL | | Log Types: | SP-IES, FDC-GR-CALIPER | | Log Types: | FORM 5 TO REPORT CMT SQUEEZE FOR 6/24/2011 W/ 100 SACKS OF CEMENT. NO NEW LOGS RUN FOR THIS FORM 5. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 651 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 651 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 4735 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 4000 ft., Bottom: 4784 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 4735 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 3040 ft., Bottom: 4000 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 3.875 in., Size: 2.875 in., Top: 4716 ft., Depth: 8173 ft., Weight: 6.5 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 5595 ft., Bottom: 8173 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3388 ft., Depth: 4688 ft., Bottom: 4688 ft., Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4654 ft., Depth: 4686 ft., Bottom: 4686 ft., Sacks: 200, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4648 ft. | | | | | NIOBRARA | 7384 ft. | | | | | FORT HAYS | 7574 ft. | | | | | CODELL | 7596 ft. | | | | | J SAND | 8038 ft. | | | |
Formation JSND Formation Classification: OG Status: AB - 10/22/2014 Interval Top: 8048 ft. Interval Bottom: 8065 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/10/1999 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/1/1999 | | Treatment Summary: | FRAC'D JSND W/ 485,080# 20/40 MESH; 201,222 GAL GELLED FLUID |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 37429 | | CALC_MCF_GAS | 262 | | CASING_PRESS | 230 | | GRAVITY_OIL | 60 | | MCF_GAS | 262 | | TUBING_PRESS | 0 |
| | Perforation Data: | | Interval Top: | 8048 ft. | # Of Holes: | 69 | | Interval Bottom: | 8065 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OG Status: CM - 10/22/2014 Interval Top: 7596 ft. Interval Bottom: 7616 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/25/2011 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/1/2011 | | Treatment Summary: | Frac Codell down 2-7/8" Tbg w/ Pkr ^ Nio w/ 144,228 gal pHaser w/ 221,280# 20/40, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7596 ft. | # Of Holes: | 40 | | Interval Bottom: | 7616 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OG Status: AB - 2/6/2015 Interval Top: 7384 ft. Interval Bottom: 7616 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/25/2011 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6376 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/25/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1294 | | CALC_MCF_GAS | 5 | | CASING_PRESS | 700 | | GRAVITY_OIL | 47 | | MCF_GAS | 5 | | TUBING_PRESS | 750 |
| | Perforation Data: | | Interval Top: | 7384 ft. | # Of Holes: | 84 | | Interval Bottom: | 7616 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 10/22/2014 Interval Top: 7384 ft. Interval Bottom: 7474 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/25/2011 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/1/2011 | | Treatment Summary: | Frac Niobrara B & C down 2-7/8" Tbg w/ Pkr ^ Nio w/ 252 gal 15% HCl & 171,192 gal pHaser Hybrid w/ 250,720# 20/40, 4,000# SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7384 ft. | # Of Holes: | 44 | | Interval Bottom: | 7474 ft. | Hole Size: | 0.38 in. |
|
Formation SUSX Formation Classification: GW Status: AB - 7/6/2005 Interval Top: 4654 ft. Interval Bottom: 4686 ft.| Completed Information for Formation SUSSEX | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SUSSEX | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/6/2005 | | Treatment Summary: | SUSSEX SQUEEZED OFF |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | BBLS_OIL | 60 | | CALC_MCF_GAS | 180 |
| | Perforation Data: | | Interval Top: | 4654 ft. | # Of Holes: | 72 | | Interval Bottom: | 4686 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/22/2014 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|