Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

API number must be numeric.
Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23009
Well Classification: GW Status: PA - 6/28/2018
Well Name/No:VESSELS #23-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/28/2018
FacilityID:278119LocationID:335664
Municipality/County:ERIE / WELD #123Location:NWSW 19 1N68W 6
Field:WATTENBERG - #90750Elevation:5060 ft.
Planned Location:1557FSL  1055 FWLLat/Long: 40.033527 / -105.051597Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.033560 / -105.051630Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 12/6/2017             Measured TD: 8542 ft.    Vertical TD: 8421 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 12/6/2017
Wellbore PermitDIRECTIONAL
Permit #:20062615 Expiration Date:6/6/2006
Proposed Top PZ Location:Sec: Twp: Footage: 2080 FSL  1980 FWL
Bottom Hole Location:Sec:19 Twp: 1N 68W Footage: 2080 FSL  1980 FWL
Proposed Depth/Form:8582 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 407 , Unit Acreage: 320, Drill Unit: S/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:11/21/2006
Spud Date:11/11/2006Spud Date Is:ACTUAL
Measured TD:8542 ft.Measured PB depth:8508 ft.
True Vertical TD:8421 ft.True Vertical PB depth:8387 ft.
Top PZ Location:Sec:19 Twp: 1N 68WFootage: 2093 FSL  1986 FWL
Bottom Hole Location:Sec:19 Twp: 1N 68WFootage: 2093 FSL  1986 FWL
Log Types:CBL,DUAL IND/COMPENSATED DEN/COMP. NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 898 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 697, Top: 0 ft., Bottom: 898 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8537 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6770 ft., Bottom: 8537 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4715 ft.NN
SHANNON5225 ft.NN
NIOBRARA7548 ft.NN
CODELL7952 ft.NN
J SAND8396 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 6/28/2018                 Interval Top: 8396 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/12/2006
Treatment Summary:JSND COMPLETION. FRAC'D THE J SAND W/173,208 GAL FRAC FLUID & 251,220# SAND. 12/12/06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
No Perforation Data was found for formation JSND.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 2/21/2007                 Interval Top: 7548 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:2/19/2007Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/21/2006
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP'S @ 7770' & 8050' TO COMMINGLE THE JSND-NBRR-CDL. 2/9/07
Tubing Size:2.375 in.Tubing Setting Depth:8256 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/21/2007Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 82
BBLS_OIL 90
BTU_GAS 1274
CALC_BBLS_H2O 82
CALC_BBLS_OIL 90
CALC_GOR 4444
CALC_MCF_GAS 400
CASING_PRESS 1350
MCF_GAS 400
TUBING_PRESS 680
No Perforation Data was found for formation JNBCD.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/28/2018                 Interval Top: 7548 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/12/2006
Treatment Summary:NBRR-CDL RECOMPLETION, SET CFP@ 8050'. FRAC'D CODELL W/ 111,300 GALS FRAC FLUID& 250,280# SAND. 12/12/06. SET CFP@ 7770'. FRAC'D NBRR W/178,542 GAL FRAC FLUID & 252,100# SAND. 12/12/06
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
No Perforation Data was found for formation NB-CD.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/28/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No