|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 12/6/2017 Measured TD: 8542 ft. Vertical TD: 8421 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 12/6/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | 20062615 | Expiration Date: | 6/6/2006 | Proposed Top PZ Location: | Sec: Twp: | Footage: 2080 FSL 1980 FWL | Bottom Hole Location: | Sec:19 Twp: 1N 68W | Footage: 2080 FSL 1980 FWL | Proposed Depth/Form: | 8582 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
Wellbore Completed | Completion Date: | 11/21/2006 | Spud Date: | 11/11/2006 | Spud Date Is: | ACTUAL | Measured TD: | 8542 ft. | Measured PB depth: | 8508 ft. | True Vertical TD: | 8421 ft. | True Vertical PB depth: | 8387 ft. | Top PZ Location: | Sec:19 Twp: 1N 68W | Footage: 2093 FSL 1986 FWL | Bottom Hole Location: | Sec:19 Twp: 1N 68W | Footage: 2093 FSL 1986 FWL | Log Types: | CBL,DUAL IND/COMPENSATED DEN/COMP. NEUTRON | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 898 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 697, Top: 0 ft., Bottom: 898 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8537 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 6770 ft., Bottom: 8537 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4715 ft. | | N | N | SHANNON | 5225 ft. | | N | N | NIOBRARA | 7548 ft. | | N | N | CODELL | 7952 ft. | | N | N | J SAND | 8396 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 6/28/2018 Interval Top: 8396 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/12/2006 | Treatment Summary: | JSND COMPLETION. FRAC'D THE J SAND W/173,208 GAL FRAC FLUID & 251,220# SAND. 12/12/06 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| No Perforation Data was found for formation JSND. |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/21/2007 Interval Top: 7548 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 2/19/2007 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/21/2006 | Treatment Summary: | JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP'S @ 7770' & 8050' TO COMMINGLE THE JSND-NBRR-CDL. 2/9/07 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8256 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/21/2007 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 82 | BBLS_OIL | 90 | BTU_GAS | 1274 | CALC_BBLS_H2O | 82 | CALC_BBLS_OIL | 90 | CALC_GOR | 4444 | CALC_MCF_GAS | 400 | CASING_PRESS | 1350 | MCF_GAS | 400 | TUBING_PRESS | 680 |
| No Perforation Data was found for formation JNBCD. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/28/2018 Interval Top: 7548 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 12/12/2006 | Treatment Summary: | NBRR-CDL RECOMPLETION, SET CFP@ 8050'. FRAC'D CODELL W/ 111,300 GALS FRAC FLUID& 250,280# SAND. 12/12/06. SET CFP@ 7770'. FRAC'D NBRR W/178,542 GAL FRAC FLUID & 252,100# SAND. 12/12/06 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
Reported Plugged | Y | 06/28/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|