Engineer | Form: (06 ) 401411473 10/3/2017 | If there has not been a Bradenhead test within 60 days of plugging this well,prior to starting plugging operations a bradenhead test shall be performed. If the well was not sampled as part of a prior test it should be sampled if pressure is 25# or greater. |
Engineer | Form: (06 ) 401411473 10/3/2017 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|