Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11945
Well Classification: ERIW Status: IJ - 3/1/2020
Well Name/No:FEE #162Y
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date3/1/2020
FacilityID:430100LocationID:430099
County:RIO BLANCO #103Location:NWNE 28 2N102W 6
Field:RANGELY - #72370Elevation:5320 ft.
Planned Location:566FNL  1443 FELLat/Long: 40.119750 / -108.844017Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.119761 / -108.844049Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 3/1/2020             Measured TD: 6677 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 3/1/2020
Wellbore Permit
Permit #: Expiration Date:8/29/2014
Prop Depth/Form:6800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 37 , Citings Type: PLANNED
Cement:Sacks: 2, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 425, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5881 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 720, Top: 0 ft., Bottom: 5581 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 5.5 in., Top: 5581 ft., Depth: 6800 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 75, Top: 5381 ft., Bottom: 6800 ft.

Wellbore Completed
Completion Date:12/14/2012
Spud Date:12/3/2012Spud Date Is:ACTUAL
Measured TD:6677 ft.Measured PB depth:6677 ft.
True Vertical TD:True Vertical PB depth:
Log Types:ARRAY INDUCTION, MUD LOG, CBL, NEUTRON AND SONIC HARD COPY MAILED WITH A COPY OF THIS FORM ON FEB 19TH.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2011 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 0 ft., Bottom: 2011 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6667 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 885, Top: 2305 ft., Bottom: 6677 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
WEBER5881 ft.6667 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 3/1/2020                  Interval Top: 5948 ft.    Interval Bottom: 6410 ft.

 Completed Information for Formation WEBER
1st Production Date:1/23/2013Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/17/2020Treatment End Date:2/18/2020
Treatment Summary:WELL WAS CLEANED OUT TO PBTD, RE-PERFORATED AND ADD NEW PERFORATIONS, ACIDIZED WITH 6000 GALLONS (142.8 BBLS) OF HCL 15% WITH 6% CITRIC ACID AND 90 BBLS OF WATER. RETURN TO INJECTION PENDING APPROVAL OF MIT.
Total fluid used in treatment (bbls):232Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):142Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):90Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/29/2015Treatment End Date:5/29/2015
Treatment Summary:Acid stimulation - pumped 4000 gallons 15% HCl
Total fluid used in treatment (bbls):135Max pressure during treatment (psi):4500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/2/2014Treatment End Date:5/2/2014
Treatment Summary:1500 GALLONS 15% HCL AT 3 BPM
Total fluid used in treatment (bbls):151Max pressure during treatment (psi):2150
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):96Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):55Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/24/2013Treatment End Date:1/24/2013
Treatment Summary:1500 GALLONS 15% HCL AT 0.5 BPM @ 1500 PSI TO BREAKDOWN PERFS
Total fluid used in treatment (bbls):63Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):240Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):28Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:5939 ft.
Tubing Packer Depth:5851 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5948 ft.# Of Holes:525
Interval Bottom:6410 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)215173
GOR
GOR DeterminationMCFE
Average BOE per Day101.458
Average MCFE per Day588.451

 Federal Financial Assurance  i 

 Tribal Well  i No