|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2023 Measured TD: 11037 ft. Vertical TD: 10905 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20074794 | Expiration Date: | 11/1/2008 | | Proposed Top PZ Location: | Sec:19 Twp: 2S 97W | Footage: 1136 FSL 1786 FEL | | Bottom Hole Location: | Sec:19 Twp: 2S 97W | Footage: 1136 FSL 1786 FEL | | Proposed Depth/Form: | 11373 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 527-4 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: 527-4 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 527-1 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 26 in., Top: , Depth: 100 ft., Weight: 54 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 6/25/2008 | | Spud Date: | 6/7/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 11037 ft. | Measured PB depth: | 10988 ft. | | True Vertical TD: | 10905 ft. | True Vertical PB depth: | 10856 ft. | | Top PZ Location: | Sec:19 Twp: 2S 97W | Footage: 1136 FSL 1786 FEL | | Bottom Hole Location: | Sec:19 Twp: 2S 97W | Footage: 1136 FSL 1786 FEL | | Log Types: | HV, AISFE, CDN/CPD, COMP TRIPLE COMBO, CBL, MUD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 5050 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 485, Top: 2007 ft., Bottom: 5050 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11037 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 841, Top: 5460 ft., Bottom: 11037 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 2007 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 351, Top: 0 ft., Bottom: 2007 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH A | 2123 ft. | | N | N | | OHIO CREEK | 6065 ft. | | N | N | | WILLIAMS FORK | 6241 ft. | | N | N | | CAMEO | 9425 ft. | | N | N | | ROLLINS | 9977 ft. | | N | N | | COZZETTE | 10117 ft. | | N | N | | CORCORAN | 10452 ft. | | N | N |
Formation CRCRN Formation Classification: GW Status: PR - 5/1/2023 Interval Top: 10480 ft. Interval Bottom: 10948 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 8/28/2012 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/12/2008 | | Treatment Summary: | 10480'-10693' - 148439# 20/40 OTTAWA SAND, 3600 BBLS SLICK WATER; 10738'-10948' - 173300# 20/40 OTTAWA SAND, 4127 BBLS SLICK WATER. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9091 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BTU_GAS | 1062 | | CALC_BBLS_H2O | 20 | | CALC_MCF_GAS | 301 | | CASING_PRESS | 1300 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 10480 ft. | # Of Holes: | 36 | | Interval Bottom: | 10948 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 5/1/2023 Interval Top: 10122 ft. Interval Bottom: 10419 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 8/28/2012 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/13/2008 | | Treatment Summary: | 10122'-10315' - 137100# 20/40 OTTAWA SAND, 3368 BBLS SLICK WATER; 10384'-10419' - 18961# 20/40 OTTAWA SAND, 460 BBLS SLICK WATER. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9091 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BTU_GAS | 1062 | | CALC_BBLS_H2O | 20 | | CALC_MCF_GAS | 301 | | CASING_PRESS | 1300 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 10122 ft. | # Of Holes: | 25 | | Interval Bottom: | 10419 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 5/1/2023 Interval Top: 6935 ft. Interval Bottom: 9919 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/28/2012 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | 6935'-7103' - 30100# 100 MESH, 153600# 30/50 SAND. 7702'-7994' - 26000# 100 MESH, 122500# 30/50 SAND, 6011 BBLS SLICKWATER. 7146'-7403'-19800# 100 MESH, 98800# 30/50 SAND, 4617 BBLS SLICKWATER/8018'-8283' - 25800# 100 MESH, 129400# 30/50 SAND, SLICKWATER 7452'-7651' - 27100# 100 MESH, 140000# 30/50 SAND. 8313'-8605' - 38800# 100 MESH, 194400# 30/50 SAND, SLICKWATER. | | Formation Treatment | | Treatment Date: | 8/14/2008 | | Treatment Summary: | 8734'-9039' - 132500# 20/40 OTTAWA SAND, 3205 BBLS SLICK WATER; 9156'-9417' - 135300# 20/40 OTTAWA SAND, 3330 BBLS SLICK WATER; 9530'-9919' - 332200# 20/40 OTTAWA SAND, 7410 BBLS SLICKWATER. | | Formation Treatment | | Treatment Date: | 8/13/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9091 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 23 | | BBLS_OIL | 0 | | BTU_GAS | 1062 | | CALC_BBLS_H2O | 137 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 643667 | | CALC_MCF_GAS | 2051 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 52 | | MCF_GAS | 342 |
| | Perforation Data: | | Interval Top: | 6935 ft. | # Of Holes: | 118 | | Interval Bottom: | 9919 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 9/4/2012 Interval Top: 6935 ft. Interval Bottom: 10419 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 8/28/2012 | Choke Size: | 16.000 in. | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9091 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/4/2012 | Test Method: | Separator/EFM | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BBLS_OIL | 1 | | BTU_GAS | 1 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 616000 | | CALC_MCF_GAS | 616 | | CASING_PRESS | 652 | | GRAVITY_OIL | 52 | | MCF_GAS | 616 | | TUBING_PRESS | 321 |
| | Perforation Data: | | Interval Top: | 6935 ft. | # Of Holes: | 179 | | Interval Bottom: | 10419 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: GW Status: CM - 9/17/2011 Interval Top: 6935 ft. Interval Bottom: 8605 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 9/11/2011 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/25/2011 | | Treatment Summary: | 6935'-7103' - 30100# 1000 MESH, 153600# 30/50 SAND; 7702'-7994' - 26000# 100 MESH, 122500# 30/50 SAND, 6011 BBLS SLICK WTR; 7146'-7403' - 19800# 100 MESH, 98800# 30/50 SAND, 4617 BBLS SLICK WTR/8018'-8283' - 25800# 100 MESH, 129400# 30/50 SAND; 7452'-7651' - 27100# 100 MESH, 140000# 30/50 SAND; 8313'-8605' - 38800# 100 MESH, 194400# 30/50 SAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8309 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/17/2011 | Test Method: | SEPARATOR/EFM | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 625 | | BTU_GAS | 1062 | | CALC_BBLS_H2O | 625 | | CALC_MCF_GAS | 2849 | | CASING_PRESS | 800 | | MCF_GAS | 2849 |
| | Perforation Data: | | Interval Top: | 6935 ft. | # Of Holes: | 59 | | Interval Bottom: | 8605 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 236 |
| Total Gas Produced (MCF) | 48289 |
| GOR | 204614 |
| GOR Determination | MCFE |
| Average BOE per Day | 23.168 |
| Average MCFE per Day | 134.379 |
| Federal Financial Assurance | i | |
|
|