| Engineer | Form: (04) 403253793 12/12/2022 | 1)This well is required to be repaired or plugged by 4/17/2023 |
| OGLA | Form: (04) 403298019 01/23/2023 | Operator will control and collect any emissions or fluids within the well during repair operations. |
| Engineer | Form: (04) 403298019 01/24/2023 | 1) Submit a Form 5 within 30 days of the work with job related documents including a minimum of one of the following attachments: operations summary, cement job summary and/or wireline summary. Additionally, include CBL’s and any additional logs run.
2) Repair or P&A well by 4/17/2023 (6 months from BH test 403201100)
3) Complete a Form 17 Bradenhead test upon completion of mitigation work |