Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10754
Well Classification: ERIW Status: IJ - 10/4/2022
Well Name/No:BEEZLEY #1-22 AX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:D 051174
Facility Status:IJStatus Date10/4/2022
FacilityID:284716LocationID:316539
County:RIO BLANCO #103Location:SENE 22 2N103W 6
Field:RANGELY - #72370Elevation:5569 ft.
Planned Location:2141FNL  911 FELLat/Long: 40.130006 / -108.936286Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.130027 / -108.936307Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OTH             Status: IJ - 10/4/2022             Measured TD: 6738 ft.    Vertical TD: 6713 ft.

 Wellbore Data for Original WellboreWellbore Classification: OTH        IJ - 10/4/2022
Wellbore Permit
Permit #:20061341 Expiration Date:5/10/2007
Prop Depth/Form:6881 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBR SD Unit Number:COC 47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/14/2006
Spud Date:9/7/2006Spud Date Is:ACTUAL
Measured TD:6738 ft.Measured PB depth:6738 ft.
True Vertical TD:6713 ft.True Vertical PB depth:
Top PZ Location:Sec:22 Twp: 2N 103WFootage: 2287 FNL  1401 FELDepth
Bottom Hole Location:Sec:22 Twp: 2N 103WFootage: 2287 FNL  1401 FELDepth
Log Types:CMT BOND; ARRAY IND-SFL; COMP PHOTO DEN/COMP DUAL NEUTRON
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2061 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 2061 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6301 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 6301 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3753 ft.NN
MORRISON3836 ft.NN
CURTIS4530 ft.NN
ENTRADA4629 ft.NN
CARMEL4774 ft.NN
NAVAJO4834 ft.NN
CHINLE5468 ft.NN
SHINARUMP5588 ft.NN
MOENKOPI5653 ft.NN
WEBER6289 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 10/4/2022                 Interval Top: 6301 ft.    Interval Bottom: 6738 ft.

 Completed Information for Formation WEBER
1st Production Date:3/13/2007Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/3/2022Treatment End Date:10/3/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/COLVENT AND 35 BBLS WATER. FIRST DATE OF INJECTION 03/13/2007
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/11/2021Treatment End Date:11/11/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/COLVENT AND 48 BBLS WATER. FIRST DATE OF INJECTION 03/13/2007
Total fluid used in treatment (bbls):143Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):48Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/5/2021Treatment End Date:3/5/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 65 BBLS WATER
Total fluid used in treatment (bbls):160Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):65Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/3/2020Treatment End Date:4/3/2020
Treatment Summary:PUMPED 4000 GALLONS 95 BBLS 15% HCL W/SOLVENT AND 38 BBLS FRESH WATER
Total fluid used in treatment (bbls):133Max pressure during treatment (psi):2350
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):38Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/12/2015Treatment End Date:8/12/2015
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 165 GALLONS MUSOL SOLVENT
Total fluid used in treatment (bbls):299Max pressure during treatment (psi):2298
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/14/2006
Treatment Summary:CLEAN OUT OPEN HOLE 6301-6738'
Tubing Size:2.875 in.Tubing Setting Depth:6233 ft.
Tubing Packer Depth:6136 ft.Tubing Multiple Packer:
Open Hole Top:6301 ft.Open Hole Bottom:6738 ft.
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6301 ft.# Of Holes:
Interval Bottom:6738 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)138781
GOR
GOR DeterminationMCFE
Average BOE per Day66.115
Average MCFE per Day383.463

 Federal Financial Assurance  i Y

 Tribal Well  i No