Engineer | Form: (04 ) 402584713 4/19/2021 | 1) This sundry to conduct bradenhead diagnostic evaluations is valid until 1/27/2022
2) For Wells that have sustained casing pressure above the action threshold as determined through diagnostic testing and evaluation, the Operator will provide a PMP with the Form 4, including a description of the Operator’s findings from the previous year, number of times the well was blown down, a current WBD and future plans for more frequent monitoring or testing, pressure mitigation, or remedial well work by 1/27/2022
3) Submit the gas sample analysis from previous Form 17 bradenhead test on a Form 43
4) Bradenhead bleed off is required to be in compliance with COGCC and CDPHE regulations. |
Engineer | Form: (04 ) 402937248 2/28/2022 | 1) Operator shall comply with COGCC Rule 419. Bradenhead Monitoring, Testing, and Reporting and Rule 420. Form 17, Bradenhead Test Report
2) At least once a year shut in bradenhead for 7 days or until the pressure reaches the bradenhead threshold and perform a bradenhead test. Report results on a Form 17, as specified in Rule 420 or other Director approved submittal method. |