| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/24/2024 | Treatment End Date: | 6/24/2024 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ SOLVENT AND 55 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 150 | Max pressure during treatment (psi): | 2260 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 55 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 11/28/2022 | Treatment End Date: | N/A |
| Treatment Summary: | Rig up. Release top PS1 packer and lokset packer also released. Laid down injection string and picked up workstring. Ran 7” casing scrapper to end of casing then ran 6-18” bit and cleaned out to PBTD at 6670’. Ran and set 7” lokset packer at 6451’ and tested casing successfully. Ran and set 7” PS1 packer @ 6399’. Tested casing to 1200 psi for 30 minutes and tubing to 3000 psi. Rig Down. Pressure test reported on Document# 403133819 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/12/2021 | Treatment End Date: | 11/12/2021 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL AND 6% CITRIC ACID WITH 46 BBLS WATER |
| Total fluid used in treatment (bbls): | 141 | Max pressure during treatment (psi): | 2150 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 46 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/19/2021 | Treatment End Date: | 7/19/2021 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL AND 6% CITRIC ACID WITH 40 BBLS WATER |
| Total fluid used in treatment (bbls): | 135 | Max pressure during treatment (psi): | 2090 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 10/6/2006 |
| Treatment Summary: | 6512-6670'= OPEN HOLE |