Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10122
Well Classification: GW Status: PA - 10/24/2023
Well Name/No:PICEANCE CREEK UNIT #T21X-19G
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COD 035679
Facility Status:PAStatus Date10/24/2023
FacilityID:259871LocationID:316261
County:RIO BLANCO #103Location:NENW 19 2S96W 6
Field:PICEANCE CREEK - #68800Elevation:7395 ft.
Basin:PICEANCE BASIN  
Planned Location:462FNL  1309 FWLLat/Long: 39.868142 / -108.214053Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.868300 / -108.213880Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/24/2023             Measured TD: 12773 ft.    Vertical TD: 12753 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/24/2023
Wellbore Permit
Permit #:20030460 Expiration Date:3/25/2004
Proposed Depth/Form:13000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:PICEANCE CREEK Unit Number:COC 47666X
Formation And Spacing:Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: 160, Drill Unit: NW
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: , Depth: 80 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 0 ft., Bottom: 80 ft.

Wellbore Completed
Completion Date:2/2/2004
Spud Date:10/25/2003Spud Date Is:ACTUAL
Measured TD:12773 ft.Measured PB depth:12665 ft.
True Vertical TD:12753 ft.True Vertical PB depth:12649 ft.
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3225 ft., Weight: 43.5# , Citings Type: ACTUAL
Cement:Sacks: 545, Top: 1349 ft., Bottom: 3225 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 4.5 in., Top: 0 ft., Depth: 12753 ft., Weight: 15.1# , Citings Type: ACTUAL
Cement:Sacks: 1135, Top: 6902 ft., Bottom: 12753 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: 4.5 in., Top: , Depth: 6902 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 5000 ft., Bottom: 6902 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 1349 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 456, Top: 0 ft., Bottom: 1349 ft., Determination Method: VISU
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 50 ft., Bottom: 50 ft., Sacks: 110, Method: Top Out
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK9080 ft.11269 ft.NN
CAMEO11396 ft.11400 ft.NN
CORCORAN-COZZETTE-ROLLINS12196 ft.12646 ft.NN

Formation CRCRN                   Formation Classification:  GW                   Status:  AB - 10/24/2023                Interval Top: 12417 ft.    Interval Bottom: 12646 ft.

 Completed Information for Formation CORCORAN
1st Production Date:2/22/2004Choke Size: 
Formation Name:CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2004
Treatment Summary:FRAC W/78,000 GALS OF FLUID AND99K# SD. SET PLUG @12390'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 198
CASING_PRESS 636
MCF_GAS 198
TUBING_PRESS 200
Perforation Data:
Interval Top:12417 ft.# Of Holes:72
Interval Bottom:12646 ft.Hole Size:2.5 in.

Formation COZZ                     Formation Classification:  GW                     Status:  AB - 10/24/2023                Interval Top: 12196 ft.    Interval Bottom: 12370 ft.

 Completed Information for Formation COZZETTE
1st Production Date:2/22/2004Choke Size: 
Formation Name:COZZETTECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2004
Treatment Summary:FRAC W/81,000 GALS FLUID AND 107.9 K#'S SAND. SET CFP @10200'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BBLS_OIL 0
CALC_BBLS_H2O 23
CALC_BBLS_OIL 0
CALC_MCF_GAS 369
CASING_PRESS 636
MCF_GAS 369
TUBING_PRESS 200
Perforation Data:
Interval Top:12196 ft.# Of Holes:32
Interval Bottom:12370 ft.Hole Size:2.5 in.

Formation WFCM                     Formation Classification:  GW                     Status:  AB - 10/24/2023                Interval Top: 9080 ft.    Interval Bottom: 9230 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:2/22/2004Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/2/2004
Treatment Summary:WMFK 9080-10170 FRACD W/A TOTAL OF 213860 GALS PAD & 257000#SAND.;DRLD OUT ALL PLUGS TO PBTD OF 12665 MD;10341-11369 FRACD W/298500 GAL FLUID & 339000#SAND;SET CFP @ 10200;PERFD REMAINDER OF WMFK INTERVALS. CAMEO FRACD W/37000 GALS FLUID AND 40000# SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 22
BBLS_OIL 0
CALC_BBLS_H2O 22
CALC_BBLS_OIL 0
CALC_MCF_GAS 4570
MCF_GAS 4570
TUBING_PRESS 200
Perforation Data:
Interval Top:9080 ft.# Of Holes:16
Interval Bottom:9230 ft.Hole Size:2.2 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/24/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No