Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-07716
Well Classification: ERIW Status: IJ - 2/15/2021
Well Name/No:MCLAUGHLIN, A C #63X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date2/15/2021
FacilityID:230057LocationID:314994
County:RIO BLANCO #103Location:SESW 13 2N103W 6
Field:RANGELY - #72370Elevation:5445 ft.
Planned Location:1201FSL  1401 FWLLat/Long: 40.139055 / -108.909177Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.139130 / -108.909130Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 2/15/2021             Measured TD: 6590 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 2/15/2021
Wellbore Permit
Permit #:750490 Expiration Date:10/11/1975
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:8/12/1975
Spud Date:7/23/1975Spud Date Is:ACTUAL
Measured TD:6590 ft.Measured PB depth:6586 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NO NEW LOGS
Casing:String Type: SURF, Hole Size: 15 in., Size: 10.75 in., Top: 0 ft., Depth: 758 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 758 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6590 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 1980 ft., Bottom: 6590 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 6181 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 281, Top: 0 ft., Bottom: 6181 ft., Determination Method: VISU
Additional Cement:String Type: 1ST , Top: 3648 ft., Depth: 3648 ft., Bottom: 4310 ft., Sacks: 225, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 808 ft., Bottom: 808 ft., Sacks: 139, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
DAKOTA3610 ft.NN
MORRISON3677 ft.
CURTIS4384 ft.
ENTRADA4512 ft.
CARMEL4654 ft.
NAVAJO4710 ft.NN
CHINLE5340 ft.
SHINARUMP5455 ft.NN
MOENKOPI5523 ft.NN
WEBER6224 ft.6590 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 2/15/2021                 Interval Top: 6244 ft.    Interval Bottom: 6576 ft.

 Completed Information for Formation WEBER
1st Production Date:9/5/1975Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/11/2021Treatment End Date:2/11/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID WITH MUTUAL SOLVENT AND 47 BBLS WATER
Total fluid used in treatment (bbls):96Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):47Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/20/2019Treatment End Date:2/20/2019
Treatment Summary:INJECTION WELL SHUT IN ON 5/31/2018 FOR HIGH CASING PRESSURE. FISH PACKERS AND SELECTIVE INJECTION EQUIPMENT. 2 CASING CEMENT SQUEEZE JOBS (REPORTED ON FORM 5 #401950505. RAN 5 1/2" CASING FROM SURFACE TO 6181'. RAN 195 JTS NEW FIBERLINED TUBING ANDF PACKERS. WITNESSED MIT SCHEDULED FOR MARCH 6TH, WELL TO BE RETURNED TO INJECTION UPON APPROVAL.
Total fluid used in treatment (bbls):128Max pressure during treatment (psi):1125
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/29/2015Treatment End Date:6/29/2015
Treatment Summary:Pumped 4000 gallons 15% Hcl w/ 330 gallons of solvent at 3.5 bpm @ 2100 psi
Total fluid used in treatment (bbls):192Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):89Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/15/2010
Treatment Summary:ACID STIMULATION 9/15/10 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF COLIED TUBING 6220' AT STARTING PRESSURE OF 1700 PSI.
Formation Treatment
Treatment Date:10/13/2009
Treatment Summary:ACID STIMULATION 10/13/09 PUMPED 4000 GALLONS OF 20% HCI THROUGH TUBING.
Tubing Size:2.875 in.Tubing Setting Depth:6189 ft.
Tubing Packer Depth:6013 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6244 ft.# Of Holes:69
Interval Bottom:6576 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)181569
GOR
GOR DeterminationMCFE
Average BOE per Day85.025
Average MCFE per Day493.144

 Federal Financial Assurance  i Y

 Tribal Well  i No