Wellbore #00 Wellbore Classification: GW Status: AC - 6/1/2023 Measured TD: 6292 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AC - 6/1/2023 | Wellbore Permit | | Permit #: | 100001 | Expiration Date: | 2/24/2000 | Prop Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 10/1/1984 | Measured TD: | 6292 ft. | Measured PB depth: | 6246 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 2210 ft., Weight: 40.5 , Citings Type: ACTUAL | Cement: | Sacks: 800, Top: 0 ft., Bottom: 2210 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5636 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 800, Top: , Bottom: 5636 ft., Determination Method: CALC | Casing: | String Type: 1ST LINER, Hole Size: , Size: 5.5 in., Top: 5446 ft., Depth: 6338 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 5446 ft., Bottom: 6338 ft., Determination Method: CALC | Additional Cement: | String Type: 1ST , Top: 5520 ft., Depth: 5652 ft., Bottom: 5652 ft., Sacks: 125, Method: Squeeze | Formation | Interval Top | Log Bottom | Cored | DSTs | DAKOTA | 3005 ft. | | | | MORRISON | 3078 ft. | | | | CURTIS | 3681 ft. | | | | ENTRADA | 3776 ft. | | | | CARMEL | 3930 ft. | | | | NAVAJO | 3980 ft. | | | | CHINLE | 4662 ft. | | | | WEBER | 5543 ft. | | | |
Formation WEBR Formation Classification: OBW Status: AC - 6/1/2023 Interval Top: 5550 ft. Interval Bottom: 6191 ft. Completed Information for Formation WEBER | 1st Production Date: | 3/1/1964 | Choke Size: | | Formation Name: | WEBER | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 5/30/2017 | Treatment End Date: | N/A | Treatment Summary: | TUBING PLUG WAS SET AT 5389' ON 2/4/1999.
WELL WAS CONVERTED TO GAS INJECTOR 12/1/1957, CONVERTED TO WATER INJECTION 3/1/1964 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6219 ft. | Tubing Packer Depth: | 5364 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WEBR. |
| Perforation Data: | Interval Top: | 5550 ft. | # Of Holes: | 132 | Interval Bottom: | 6191 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|