Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06167
Well Classification: ERIW Status: IJ - 11/8/2022
Well Name/No:UNION PACIFIC #56-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date11/8/2022
FacilityID:229088LocationID:314590
County:RIO BLANCO #103Location:SENE 21 2N102W 6
Field:RANGELY - #72370Elevation:5357 ft.
Planned Location:1980FNL  664 FELLat/Long: 40.130385 / -108.841135Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.130350 / -108.841220Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 11/8/2022             Measured TD: 6556 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 11/8/2022
Wellbore Permit
Permit #:100001 Expiration Date:9/6/1981
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/12/1982
Spud Date:11/3/1981Spud Date Is:ACTUAL
Measured TD:6556 ft.Measured PB depth:6540 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 57 ft., Weight: 43 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 57 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 506 ft., Weight: 32.75 , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 57 ft., Bottom: 506 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 9 in., Size: 7 in., Top: 0 ft., Depth: 6256 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 2515 ft., Bottom: 6256 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 6070 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 272, Top: 0 ft., Bottom: 6070 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: , Size: 5 in., Top: 6070 ft., Depth: 6554 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6070 ft., Bottom: 6554 ft., Determination Method: CALC
Additional Cement:String Type: 2ND , Top: 0 ft., Depth: 6022 ft., Bottom: 6070 ft., Sacks: 272, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA2564 ft.
FRONTIER3327 ft.
DAKOTA3604 ft.NN
MOWRY3604 ft.
MORRISON3692 ft.NN
CURTIS3765 ft.NN
ENTRADA4413 ft.NN
CARMEL4586 ft.NN
NAVAJO4711 ft.NN
CHINLE4760 ft.NN
SHINARUMP5352 ft.NN
MOENKOPI5495 ft.NN
WEBER5592 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 11/8/2022                 Interval Top: 6245 ft.    Interval Bottom: 6468 ft.

 Completed Information for Formation WEBER
1st Production Date:6/23/1974Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/7/2022Treatment End Date:11/7/2022
Treatment Summary:PUMED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/7/2022Treatment End Date:4/7/2022
Treatment Summary:PUMED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 40 BBLS WATER
Total fluid used in treatment (bbls):87Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/14/2021Treatment End Date:7/14/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):2100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:1/28/2020Treatment End Date:N/A
Treatment Summary:Wellwork to change out 188 joints tubing and packer.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/19/2019Treatment End Date:12/19/2019
Treatment Summary:WELL WORK TO CLEANOUT, INSTALL TIEBACK LINER, RE-PERFORATE (6262' TO 6270' AND 6287' TO 6300') , ACIDIZE (PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH 110 BBLS WATER).
Total fluid used in treatment (bbls):205Max pressure during treatment (psi):1800
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):110Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/10/2018Treatment End Date:4/10/2018
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 100 BBLS WATER AT 0.6 BPM AT 1400 PSI.
Total fluid used in treatment (bbls):195Max pressure during treatment (psi):1400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):100Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:12/7/2017Treatment End Date:N/A
Treatment Summary:High casing pressure was found on UP56-21 and the well was shut in. Well work has been completed, fiberlined tubing and packer were replaced. The top packer was set at 5970' and the tubing landed at 6480.7. A COGCC witnessed MIT is scheduled for November 30th.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:6/28/2017Treatment End Date:N/A
Treatment Summary:Tubing plug was set at 5999' on 8/1/2016. Well was converted to gas injection 11/24/1954, converted back to production 2/23/1961, converted back to injection 11/21/1974.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/15/2010
Treatment Summary:ACID STIMULATION 4/15/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 6480'. AT STARTING 2.8 BPM @ 25800 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:6082 ft.
Tubing Packer Depth:5995 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6245 ft.# Of Holes:210
Interval Bottom:6468 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)87694
GOR
GOR DeterminationMCFE
Average BOE per Day41.310
Average MCFE per Day239.623

 Federal Financial Assurance  i 

 Tribal Well  i No