Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06124
Well Classification: ERIW Status: IJ - 4/1/2024
Well Name/No:GRAY #B-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date4/1/2024
FacilityID:229046LocationID:314559
County:RIO BLANCO #103Location:SWNW 18 2N102W 6
Field:RANGELY - #72370Elevation:5413 ft.
Planned Location:1988FNL  660 FWLLat/Long: 40.144735 / -108.893057Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.144850 / -108.892960Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 4/1/2024             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 4/1/2024
Wellbore Permit
Permit #:20030998 Expiration Date:6/23/2004
Prop Depth/Form:6485 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:WEBER Unit Number:WEBER
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: 19143, Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: , Depth: 34 ft., Weight: 60.5 , Citings Type: PLANNED
Cement:Sacks: 4, Top: , Bottom:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: , Depth: 743 ft., Weight: 40.5 , Citings Type: PLANNED
Cement:Sacks: 350, Top: , Bottom:

Wellbore Completed
Completion Date:12/15/2003
Spud Date:9/22/2003Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:NONE THIS IS A RE-ENTRY WELL
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 743 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 743 ft., Determination Method: Visu
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6363 ft., Weight: 23 & 26 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 0 ft., Bottom: 6363 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 6230 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 0 ft., Bottom: 6230 ft., Determination Method: Visu
Casing:String Type: OPEN HOLE, Hole Size: , Size: , Top: 6363 ft., Depth: 6485 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FRONTIER3391 ft.NN
DAKOTA3746 ft.NN
MORRISON3820 ft.NN
CURTIS4549 ft.NN
ENTRADA4660 ft.NN
CARMEL4796 ft.NN
NAVAJO4837 ft.NN
CHINLE5465 ft.NN
SHINARUMP5590 ft.NN
MOENKOPI5904 ft.NN
WEBER6360 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 4/1/2024                  Interval Top: 6363 ft.    Interval Bottom: 6485 ft.

 Completed Information for Formation WEBER
1st Production Date:6/1/1966Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:6/7/2024Treatment End Date:N/A
Treatment Summary:Well work to upgraded tubing head from gray style and plug bushing to T-Bowl style and upgraded valves, Replaced both packers and ran new Fiber line tbg., Long spool re-built, and tbg plug remains in on/off tool. Plans to return to service pending an approved Form 21. Converted to injection 06/01/1966
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6201 ft.
Tubing Packer Depth:6114 ft.Tubing Multiple Packer:Y ft.
Open Hole Top:6363 ft.Open Hole Bottom:6485 ft.
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6363 ft.# Of Holes:
Interval Bottom:6485 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)364647
GOR
GOR DeterminationMCFE
Average BOE per Day171.936
Average MCFE per Day997.218

 Federal Financial Assurance  i Y

 Tribal Well  i No