| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 1/9/2017 | Treatment End Date: | N/A |
| Treatment Summary: | 1st injection - Changing status to injection well |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 12/30/2016 | Treatment End Date: | N/A |
| Treatment Summary: | No treatment performed. Waiting on approval to commence injection. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/22/2016 | Treatment End Date: | 8/26/2016 |
| Treatment Summary: | Perf'd 8,072'-8,090' w/ 6spf, 108 holes, 4" scallop gun, 26gm shot, .46" EHD 51.3" penetration (listed since different info that initial perf info reported)
Pump premixed 1,000 gallons Acetone, 750 gallons acetone, 750 gallons ethanol, 6,000 gals 2% KCl w/ 6.5 gals RAS-92 (anti sludge) 12 gal IC-75 (iron control) 7 gal SI-4 (scale inhibitor), 18 gal B-172 (biocide) & 150 bio balls
|
| Total fluid used in treatment (bbls): | 212 | Max pressure during treatment (psi): | 1750 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 61 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 372 |
| Fresh water used in treatment (bbls): | 151 | Disposition method For flowback: | DISPOSAL |
| Total proppant used (lbs): | | Green completions techniques utilized: | Yes |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/24/2015 | Treatment End Date: | 8/27/2015 |
| Treatment Summary: | Treated well with 12,000 gal 2% KCL mixed w/2,000 gal acetone and 1,000 gal ethanol and 100 bio balls. Displaced with 23 bbls of 2% KCl |
| Total fluid used in treatment (bbls): | 385 | Max pressure during treatment (psi): | 2580 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 76 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 |
| Fresh water used in treatment (bbls): | 309 | Disposition method For flowback: | DISPOSAL |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: PIPELINE |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/17/2015 | Treatment End Date: | 4/24/2015 |
| Treatment Summary: | Re-perforated original perfs
Acidized with 4500 gallons of 2% KCL mixed with 1000 gallons of Acetone and 500 gallons of ethanol. Displaced with 46 bbls of 2% KCL. Dropped 80 bio balls throughout the job. |
| Total fluid used in treatment (bbls): | 189 | Max pressure during treatment (psi): | 3450 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 36 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 264 |
| Fresh water used in treatment (bbls): | 153 | Disposition method For flowback: | DISPOSAL |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: PIPELINE |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 8/20/2014 | Treatment End Date: | 8/20/2014 |
| Treatment Summary: | Perforated only |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |