| Engineer | Form: (02) 400563617 03/05/2014 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage to 200’ above shallowest completed interval or 200’ above SPGN, whichever is deeper, and stage cement Cheyenne/Dakota interval (5100’ – 4450’). Verify w/ CBL.
3) If well is a dry hole set the following plugs: 40 sks cement +/- 50’ above the SPGN, 40 sks cement across any DST w/ show, 40 sks cement 100’ below base of Cheyenne (5100’ up), 40 sks cement 100’ above top of Dakota (4450’ up), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface csg, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
|
| Permit | Form: (02) 400563617 04/22/2014 | Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged. |
| Environmental | Form: (04) 400615491 05/29/2014 | A review of DWR data on the COGCC website indicates that there are no water features that meet the 100 series definition of a water source within ½ mile of the oil and gas well(s). |
| Engineer | Form: (04) 400718762 01/22/2015 | 1) The flaring of natural gas shall be conducted in accordance with COGCC Rule 912 for the initial production test period.
2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring.
3) If flaring will continue more than 6 months, submit updated requests to flare to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring.
4) The operator is required to obtain and maintain any required air permits from CDPHE.
5) The venting or flaring volumes shall be reported by Form 7, Operator’s Monthly Report of Operations.
|
| Engineer | Form: (04) 400981978 03/03/2016 | 1) Submit requests to flare annually to COGCC on Form 4 (Sundry Notice), which discusses timing to connect to sales line, plans to develop infrastructure, and justification for continued venting/flaring. Provide gas analysis including H2S with each Sundry Notice.
2) Venting or flaring of natural gas shall comply with COGCC Rule 912.
3) Report flaring volumes on Form 7, Operator’s Monthly Report of Operations.
4) Notify the local emergency dispatch or the local governmental designee of natural gas flaring.
5) The operator is required to obtain and maintain any required air permits from CDPHE. The combustion device must comply with applicable design destruction efficiency for hydrocarbons.
|
| UIC | Form: (02) 401135870 10/24/2016 | Injection is not authorized until approval of Subsequent Forms 31 and 33. |
| UIC | Form: (02) 401135870 10/24/2016 | Operator required to file Form 4 Sundry Notice with all formation tops from surface to at least top of Niobrara as shown on Scout Card. |