|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: IJ - 10/1/2025 Measured TD: 8400 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW IJ - 10/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 11/26/2018 | | Proposed Depth/Form: | 8400 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: KDRK , Formation: KINDERHOOK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SPGN , Formation: SPERGEN , Order: 556-2 , Unit Acreage: 600, Drill Unit: | | Formation And Spacing: | Code: STLS , Formation: ST LOUIS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 332 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 185, Top: 0 ft., Bottom: 332 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1635, Top: 0 ft., Bottom: 8400 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/13/2014 | | Spud Date: | 9/25/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8266 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Triple Combo | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 332 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 0 ft., Bottom: 332 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1635, Top: 0 ft., Bottom: 8400 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3740 ft. | | | | | FORT HAYS | 4098 ft. | | | | | CARLILE | 4216 ft. | | | | | GREEN RIVER | 4387 ft. | | | | | X BENTONITE | 4518 ft. | | | | | D SAND | 4620 ft. | | | | | J SAND | 4658 ft. | | | | | SKULL CREEK | 4740 ft. | | | | | CHEYENNE | 4898 ft. | | | | | MORRISON | 4921 ft. | | | | | DOCKUM | 5170 ft. | | | | | LYKINS | 5594 ft. | | | | | BLAINE | 5687 ft. | | | | | LYONS | 5769 ft. | | | | | WOLFCAMP | 6186 ft. | | | | | NEVA | 6471 ft. | | | | | FORAKER | 6559 ft. | | | | | VIRGIL | 6741 ft. | | | | | SHAWNEE | 6795 ft. | | | | | HEEBNER | 6897 ft. | | | | | LANSING-KANSAS CITY | 6910 ft. | | | | | MARMATON | 7221 ft. | | | | | CHEROKEE | 7455 ft. | | | | | ATOKA | 7633 ft. | | | | | MORROW | 7860 ft. | | | | | ST LOUIS | 8047 ft. | | | | | SPERGEN | 8106 ft. | | | | | WARSAW | 8106 ft. | | | | | KINDERHOOK | 8173 ft. | | | | | ARBUCKLE | 8250 ft. | | | |
Formation SPGN Formation Classification: OW Status: IJ - 4/1/2025 Interval Top: 8141 ft. Interval Bottom: 8174 ft.| Completed Information for Formation SPERGEN | | 1st Production Date: | 11/11/2016 | Choke Size: | | | Formation Name: | SPERGEN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/26/2017 | Treatment End Date: | N/A | | Treatment Summary: | Treatment previously reported -changing status to injecting
Adjusted tubing
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 10/17/2016 | Treatment End Date: | 10/18/2016 | | Treatment Summary: | Perf'd Lower SPGN adding depth 8,160' - 8,174' (84 holes)
Drilled out CIBP @ 8,130' that abandoned the SPGN back on 10/22/14.
300 bbls produced water with additives 111 gallons pumped
(Biocide - scale inhibitor & iron sequestering agent) | | Total fluid used in treatment (bbls): | 303 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 3 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 300 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 10/21/2014 | Treatment End Date: | 10/22/2014 | | Treatment Summary: | Perf'd 8,141' - 8,146' | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8085 ft. | | Tubing Packer Depth: | 8082 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SPGN. |
| | Perforation Data: | | Interval Top: | 8141 ft. | # Of Holes: | 114 | | Interval Bottom: | 8174 ft. | Hole Size: | 0.52 in. |
|
Formation CHRK Formation Classification: ERIW Status: AB - 11/8/2016 Interval Top: 7428 ft. Interval Bottom: 7431 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | 11/10/2014 | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/12/2016 | Treatment End Date: | N/A | | Treatment Summary: | Previously reported - AB CHRK
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 10/22/2014 | Treatment End Date: | 10/23/2014 | | Treatment Summary: | Acidized with 500 gallons of 15% HCI and displaced with 45 bbls of 2% KCI water | | Total fluid used in treatment (bbls): | 57 | Max pressure during treatment (psi): | 1310 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 45 | Total flowback volume recovered (bbls): | 72 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CHRK. |
| | Perforation Data: | | Interval Top: | 7428 ft. | # Of Holes: | 18 | | Interval Bottom: | 7431 ft. | Hole Size: | 0.48 in. |
|
Formation MRTN Formation Classification: ERIW Status: AB - 11/8/2016 Interval Top: 7266 ft. Interval Bottom: 7404 ft.| Completed Information for Formation MARMATON | | 1st Production Date: | 11/10/2014 | Choke Size: | | | Formation Name: | MARMATON | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/12/2016 | Treatment End Date: | N/A | | Treatment Summary: | Previously reported -AB MRTN | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/4/2016 | Treatment End Date: | 10/18/2016 | | Treatment Summary: | No formation treatment done - Squeeze | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 10/27/2014 | Treatment End Date: | 10/31/2014 | | Treatment Summary: | Acidized with 1200 gallons of 15% HCI and displaced with 45 bbls of 2% KCI water in perf's 7,396'-7,404'
Came uphole and Perf'd 7,266'-7,274'- Acidized with another 1200 gallons of 15% HCI and displaced with 44 bbls of 2% KCI water | | Total fluid used in treatment (bbls): | 146 | Max pressure during treatment (psi): | 1100 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 57 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 140 | | Fresh water used in treatment (bbls): | 89 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation MRTN. |
| | Perforation Data: | | Interval Top: | 7266 ft. | # Of Holes: | 96 | | Interval Bottom: | 7404 ft. | Hole Size: | 0.48 in. |
|
Formation MT-CRK Formation Classification: ERIW Status: CM - 11/8/2016 Interval Top: 7266 ft. Interval Bottom: 7431 ft.| Completed Information for Formation MARMATON-CHEROKEE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MARMATON-CHEROKEE | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/12/2016 | Treatment End Date: | N/A | | Treatment Summary: | No formation treatment done - Squeeze
AB commingled zone
| | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 521 | | CALC_BBLS_OIL | 521 | | CASING_PRESS | 3 | | GRAVITY_OIL | 38 | | TUBING_PRESS | 60 |
| | Perforation Data: | | Interval Top: | 7266 ft. | # Of Holes: | 114 | | Interval Bottom: | 7431 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 11/05/2024 |
| Defined Inactive (UIC) | Y | Defined Inactive 03/31/2018 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|