|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 6/21/2015 Measured TD: 6193 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/21/2015 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 3/18/2015 | | Proposed Depth/Form: | 8600 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LGKC , Formation: LANSING-KANSAS CITY , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SPGN , Formation: SPERGEN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/12/2013 | | Spud Date: | 4/12/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 6193 ft. | Measured PB depth: | 4355 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | No logs were ran on this wellbore as fish got stuck in the hole and we were unable to retrieve it. 185 sks of cmt was put on top of fish and a sidetrack was drilled to continue to drill the well to total depth. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 301 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 301 ft., Determination Method: CALC | | Casing: | String Type: OPEN HOLE, Hole Size: 7.875 in., Size: , Top: 301 ft., Depth: 6193 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 4355 ft., Depth: , Bottom: 5140 ft., Sacks: 185, Method: CALC |
Formation SPGN Formation Classification: OW Status: CM - 6/21/2015 Interval Top: 8020 ft. Interval Bottom: 8070 ft.| Completed Information for Formation SPERGEN | | 1st Production Date: | 5/26/2013 | Choke Size: | | | Formation Name: | SPERGEN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 6/17/2015 | Treatment End Date: | 6/19/2015 | | Treatment Summary: | Acidized with 186 bbls of 2%KCL with additives and displaced with 46 bbls of 2% KCL. Dropped 150 1.1 bio balls | | Total fluid used in treatment (bbls): | 232 | Max pressure during treatment (psi): | 2690 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 186 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 46 | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8154 ft. | | Tubing Packer Depth: | 8259 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/21/2015 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 246 | | BBLS_OIL | 84 | | BTU_GAS | 728 | | CALC_BBLS_H2O | 246 | | CALC_BBLS_OIL | 84 | | CALC_GOR | 357 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 34 | | GRAVITY_OIL | 36 | | MCF_GAS | 30 | | TUBING_PRESS | 60 |
| | Perforation Data: | | Interval Top: | 8020 ft. | # Of Holes: | 200 | | Interval Bottom: | 8070 ft. | Hole Size: | 0.52 in. |
|
Sidetrack #01 Wellbore Classification: OW Status: PR - 6/1/2025 Measured TD: 8350 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 6/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/14/2015 | | Proposed Depth/Form: | 8600 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ABCK , Formation: ARBUCKLE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LGKC , Formation: LANSING-KANSAS CITY , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SPGN , Formation: SPERGEN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCMP , Formation: WOLFCAMP , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WRSW , Formation: WARSAW , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 5/14/2013 | | Spud Date: | 4/12/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8350 ft. | Measured PB depth: | 8259 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Surface Cement, Production Cement, BHC Sonic_Final, PEX Initial Run, Triple Combo, Borehole Compensated Sonic, Induction, Nuclear Porosity, Caliper, CBL/CCL/GR and Surveys | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 301 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 301 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8350 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1218, Top: 1795 ft., Bottom: 8350 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | DAKOTA | 4586 ft. | 4647 ft. | | | | LANSING-KANSAS CITY | 6882 ft. | 7206 ft. | | | | MARMATON | 7207 ft. | 7313 ft. | | | | CHEROKEE | 7386 ft. | 7407 ft. | | | | ATOKA | 7552 ft. | 7799 ft. | | | | MORROW | 7800 ft. | 7927 ft. | | | | KEYES | 7928 ft. | 7959 ft. | | | | SPERGEN | 8016 ft. | 8037 ft. | | | | WARSAW | 8077 ft. | 8124 ft. | | | | ARBUCKLE | 8125 ft. | 8350 ft. | | |
Formation SPGN Formation Classification: OW Status: PR - 6/1/2025 Interval Top: 8020 ft. Interval Bottom: 8070 ft.| Completed Information for Formation SPERGEN | | 1st Production Date: | 5/26/2013 | Choke Size: | | | Formation Name: | SPERGEN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 4/5/2015 | Treatment End Date: | 4/7/2015 | | Treatment Summary: | Re-acidized with 3500 gallons (84 bbls) of Parene-721 solvent, 150 bioballs and displaced with 46 bbls of 2% KCl | | Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2870 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 84 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 46 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/27/2013 | Treatment End Date: | N/A | | Treatment Summary: | No treatment completed on this formation. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/26/2013 | Treatment End Date: | N/A | | Treatment Summary: | No treatment was done to this formation. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 8154 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/9/2015 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 111 | | BBLS_OIL | 117 | | BTU_GAS | 2490 | | CALC_BBLS_H2O | 111 | | CALC_BBLS_OIL | 117 | | CALC_GOR | 85 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 34 | | GRAVITY_OIL | 36 | | MCF_GAS | 10 | | TUBING_PRESS | 50 |
| | Perforation Data: | | Interval Top: | 8020 ft. | # Of Holes: | 200 | | Interval Bottom: | 8070 ft. | Hole Size: | 0.52 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 6937 |
| Total Gas Produced (MCF) | 2363 |
| GOR | 340 |
| GOR Determination | BOE |
| Average BOE per Day | 20.131 |
| Average MCFE per Day | 116.768 |
| Federal Financial Assurance | i | |
|
|