|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 3/1/2024 Measured TD: 8050 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 3/1/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 1/30/2015 | | Proposed Depth/Form: | 8400 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: FRSC , Formation: FORT SCOTT , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNA , Formation: PAWNEE A , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNB , Formation: PAWNEE B , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: TORCH , Formation: TORCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 300 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 8400 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 300, Top: 6500 ft., Bottom: 8400 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: 1 in., Size: 0 in., Top: 0 ft., Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: 3950 ft., Bottom: 4550 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/29/2013 | | Spud Date: | 7/11/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 8050 ft. | Measured PB depth: | 7322 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Compensated Density Compensated Neutron Gamma Ray
High Resolution Induction
Radial Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 309 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 309 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7348 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 6030 ft., Bottom: 7348 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3340 ft., Depth: 4578 ft., Bottom: 4578 ft., Sacks: 250, Method: STAGE TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3141 ft. | | | | | CODELL | 3686 ft. | | | | | CEDAR HILLS | 5340 ft. | | | | | LANSING | 6638 ft. | | | | | TORCH | 6975 ft. | 7000 ft. | | Y | | PAWNEE B | 7030 ft. | 7053 ft. | | Y | | CHEROKEE | 7087 ft. | | | | | MORROW | 7617 ft. | | | | | KEYES | 7794 ft. | | | |
Formation CHRK Formation Classification: OW Status: PR - 3/1/2024 Interval Top: 7096 ft. Interval Bottom: 7112 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | 8/20/2013 | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 8/6/2013 | Treatment End Date: | 8/7/2013 | | Treatment Summary: | Acid Job 15% HCL 38 bbls, 2% KCL 42 bbls | | Total fluid used in treatment (bbls): | 80 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 38 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 140 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7215 ft. | | Tubing Packer Depth: | 7215 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/7/2013 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 10 | | BTU_GAS | 1500 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 30 | | CALC_MCF_GAS | 15 | | GRAVITY_OIL | 38 | | MCF_GAS | 5 |
| | Perforation Data: | | Interval Top: | 7096 ft. | # Of Holes: | 64 | | Interval Bottom: | 7112 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1487 |
| Total Gas Produced (MCF) | 1124 |
| GOR | 755 |
| GOR Determination | BOE |
| Average BOE per Day | 4.620 |
| Average MCFE per Day | 26.797 |
| Federal Financial Assurance | i | |
|
|