TypeSource DocumentConditions of Approval
EngineerForm: (02)
400364487
01/10/2013
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) If production casing is set provide cement coverage to at least 200’ above the shallowest completed interval or Lansing, whichever is shallower and cement Cheyenne/Dakota interval (4550’-3950’ minimum). Run and submit CBL to verify cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Morrow, 40 sks cement +/- 50’ above the Cherokee, 40 sks cement +/- 50’ above the Marmaton, 40 sks cement +/- 50’ above the Lansing, 40 sks cement +/- 50’ above any DST w/ show, 40 sks cement at 4550’ up, 40 sks cement at 3950’ up, 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02 )
400364487
1/31/2013
BMP Plan Wiepking-Fullerton Energy, L.L.C. 4600 S. Downing St. Englewood, CO 80113 303-789-1798 303-761-9067 (fax) Certification to Discharge Under CDPS General Permit COR-03000 Stormwater Discharges Associated with Construction Certification Number COR 39788 Raptor # 7 well T10S, R55W Sec. 18: NW1/4SE1/4 Lincoln County, Colorado Description of Well Site and Construction Area 1-3 acre site with access road for drilling of oil and gas well. Terrain is flat with native grass and sagebrush. No receiving/surface water will be affected by well pad or access road. Surface Roughening will be used on low side of drill site to reduce speed of runoff, increase infiltration, reduce erosion, trap sediment and prepare soil for reseeding. Mud and Water Pits will be reclaimed within 6 months weather permitting. Topsoil will be separated and spread on drill site as final operation before reseeding operations. To prevent soil erosion site will be disked and straw crimped in or manure spread. Stormwater Management Plan (SWMP) is on file in Wiepking-Fullerton Energy, L.L.C. office. Spill Prevention, Control and Countermeasure Plan is on file in Wiepking-Fullerton Energy, L.L.C. office.