|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/6/2019 Measured TD: 7890 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/6/2019 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/7/2020 | | Proposed Depth/Form: | 7890 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ATOK , Formation: ATOKA , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CRTC , Formation: CRETACEOUS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MSSP , Formation: MISSISSIPPIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNA , Formation: PAWNEE A , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PAWNB , Formation: PAWNEE B , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PENN , Formation: PENNSYLVANIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: PRMN , Formation: PERMIAN , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: TORCH , Formation: TORCH , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 298 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 155, Top: 0 ft., Bottom: 298 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7884 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 265, Top: 5900 ft., Bottom: 7884 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4060 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 3580 ft., Bottom: 4080 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4663 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4400 ft., Bottom: 4663 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/30/2012 | | Spud Date: | 6/18/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 7890 ft. | Measured PB depth: | 7844 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Compensated Denisty Compensated Neutron Gamma Ray
High Resolution Induction
Radial Cement Bond Log | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 298 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 155, Top: 0 ft., Bottom: 298 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7884 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 5900 ft., Bottom: 7884 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4060 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 3580 ft., Bottom: 4080 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4663 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 4400 ft., Bottom: 4680 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 4400 ft., Depth: 4663 ft., Bottom: 4663 ft., Sacks: 250, Method: STAGE TOOL | | Additional Cement: | String Type: 1ST , Top: 3950 ft., Depth: 4060 ft., Bottom: 4060 ft., Sacks: 200, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3154 ft. | | | | | CODELL | 3635 ft. | | | | | SHAWNEE | 6350 ft. | | | | | LANSING | 6602 ft. | | | | | TORCH | 6952 ft. | | | | | PAWNEE A | 6996 ft. | | | | | PAWNEE B | 7021 ft. | | | | | CHEROKEE | 7090 ft. | | | | | MORROW | 7612 ft. | | | | | KEYES | 7806 ft. | | | |
Formation MRV11 Formation Classification: OW Status: AB - 7/11/2012 Interval Top: 7784 ft. Interval Bottom: 7796 ft.| Completed Information for Formation MORROW V-11 | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MORROW V-11 | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 7/10/2012 | Treatment End Date: | 7/11/2012 | | Treatment Summary: | Acid Job 30 bbl 12.5% HCL, 44 bbl 4% HCL | | Total fluid used in treatment (bbls): | 74 | Max pressure during treatment (psi): | 2900 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 30 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 70 | | Fresh water used in treatment (bbls): | 44 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7556 ft. | | Tubing Packer Depth: | 7556 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation MRV11. |
| | Perforation Data: | | Interval Top: | 7784 ft. | # Of Holes: | 48 | | Interval Bottom: | 7796 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: AB - 2/22/2013 Interval Top: 7094 ft. Interval Bottom: 7138 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | 8/1/2012 | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 5/29/2014 | Treatment End Date: | N/A | | Treatment Summary: | No Treatment, minimum oil production from Cherokee A formation. 5-29-2014 set CIBP @7060' Cherokee A formation plugged and abandoned | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 7/16/2012 | Treatment End Date: | 7/18/2012 | | Treatment Summary: | Acid Job 24 bbl 15% HCL, 41 bbl 2% HCL | | Total fluid used in treatment (bbls): | 65 | Max pressure during treatment (psi): | 1500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 54 | | Fresh water used in treatment (bbls): | 41 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 14 | | CALC_BBLS_H2O | 12 | | CALC_BBLS_OIL | 42 | | GRAVITY_OIL | 35 |
| | Perforation Data: | | Interval Top: | 7094 ft. | # Of Holes: | 64 | | Interval Bottom: | 7138 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNB Formation Classification: OW Status: AB - 6/2/2014 Interval Top: 7021 ft. Interval Bottom: 7035 ft.| Completed Information for Formation PAWNEE B | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | PAWNEE B | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/2/2014 | Treatment End Date: | N/A | | Treatment Summary: | No Treatment 5-29-2014 perf Pawnee B formaton 7021' - 7035' SWAB all water. 6-2-2014 set CIBP @ 7011' with 2 sks cement, Pawnee B formation plugged and abandoned | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6973 ft. | | Tubing Packer Depth: | 6973 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/2/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | CALC_BBLS_H2O | 120 |
| | Perforation Data: | | Interval Top: | 7021 ft. | # Of Holes: | 53 | | Interval Bottom: | 7035 ft. | Hole Size: | 0.25 in. |
|
Formation PAWNA Formation Classification: OW Status: AB - 6/12/2014 Interval Top: 6970 ft. Interval Bottom: 6996 ft.| Completed Information for Formation PAWNEE A | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | PAWNEE A | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 6/2/2014 | Treatment End Date: | 6/3/2014 | | Treatment Summary: | Acid Job 10 bbls 15% HCL, 42 bbls 2% KCL, SWAB recover 45 bbls all water. 6-12-2014 set CIBP @ 6990 with 2 sks cement, Pawnee A formation plugged and abandoned | | Total fluid used in treatment (bbls): | 52 | Max pressure during treatment (psi): | 660 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 10 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 45 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6949 ft. | | Tubing Packer Depth: | 6949 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/2/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 15 | | CALC_BBLS_H2O | 45 |
| | Perforation Data: | | Interval Top: | 6970 ft. | # Of Holes: | 16 | | Interval Bottom: | 6996 ft. | Hole Size: | 0.25 in. |
|
Formation TORCH Formation Classification: OW Status: AB - 10/8/2018 Interval Top: 6952 ft. Interval Bottom: 6966 ft.| Completed Information for Formation TORCH | | 1st Production Date: | 6/18/2014 | Choke Size: | | | Formation Name: | TORCH | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 6/12/2014 | Treatment End Date: | 6/16/2014 | | Treatment Summary: | 6-12-2014 acid job 33 bbls 15% HCL, 42 bbls 2% KCL SWAB recover 85 bbls of fluid
6-16-2014 acid job 48 bbls 15% HCL, 72 bbls 2% KCL SWAB recover 148 bbls of fluid | | Total fluid used in treatment (bbls): | 195 | Max pressure during treatment (psi): | 600 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 81 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 233 | | Fresh water used in treatment (bbls): | 114 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 40 | | BTU_GAS | 1400 | | CALC_BBLS_H2O | 15 | | CALC_BBLS_OIL | 120 | | CALC_MCF_GAS | 21 | | GRAVITY_OIL | 38 | | MCF_GAS | 7 |
| | Perforation Data: | | Interval Top: | 6952 ft. | # Of Holes: | 56 | | Interval Bottom: | 6966 ft. | Hole Size: | 0.25 in. |
|
Formation LNSNG Formation Classification: OW Status: AB - 6/6/2019 Interval Top: 6904 ft. Interval Bottom: 6944 ft.| Completed Information for Formation LANSING | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | LANSING | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 7/24/2018 | Treatment End Date: | 8/13/2018 | | Treatment Summary: | 7/23/2018 Set CIBP @6948', Perforate 6928'-6944'
7/24/2018 Pump 38 bbls acid and 40 bbls 2% KCL, recovered 57 bbls, 10% oil
7/25/2018 Swab recovered 21.5 bbls with a show of oil, run in rods and shut in.
8/7/2018 Pump 100 sks cement, squeeze
8/9/2018 Re-perforate 6928'-6944', pump 38 bbls acid and 50 bbls KCL, swab recovered 34 bbls, no oil
8/10/2018 Recovered 2 bbls, no oil
8/13/2018 Set CIBP @ 6922' with 1 sk cement. Perforate 6904'-6910'. Pump 15 bbls acid and 43 bbls KCL. Recovered 59 bbls water.
| | Total fluid used in treatment (bbls): | 224 | Max pressure during treatment (psi): | 1500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 91 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 173 | | Fresh water used in treatment (bbls): | 133 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation LNSNG. |
| | Perforation Data: | | Interval Top: | 6904 ft. | # Of Holes: | 88 | | Interval Bottom: | 6944 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/06/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|