Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-073-06460
Well Classification: OW Status: PR - 7/1/2020
Well Name/No:Napali #4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WIEPKING-FULLERTON ENERGY LLC - 96340
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2020
FacilityID:425333LocationID:425332
County:LINCOLN #073Location:NESW 17 10S55W 6
Field:GREAT PLAINS - #32756Elevation:5190 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1979FSL  1978 FWLLat/Long: 39.176830 / -103.577600Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.176830 / -103.577600Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 7/1/2020             Measured TD: 7870 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 7/1/2020
Wellbore Permit
Permit #: Expiration Date:2/3/2016
Proposed Depth/Form:7870 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: KEYES , Formation: KEYES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: LNSNG , Formation: LANSING , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: TORCH , Formation: TORCH , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 307 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 265, Top: 0 ft., Bottom: 307 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7856 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 5820 ft., Bottom: 7856 ft.

Wellbore Completed
Completion Date:11/24/2011
Spud Date:11/9/2011Spud Date Is:ACTUAL
Measured TD:7870 ft.Measured PB depth:7764 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Compensated Density Compensated Neutron Gamma Ray High Resolution Induction Radial Spaced Cement Bond Log Dual Spaced Cement Bond Log
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 307 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 307 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7856 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 4650 ft., Bottom: 7856 ft., Determination Method: CBL
Additional Cement:String Type: S.C. 1.1 , Top: 3100 ft., Depth: 4560 ft., Bottom: 4560 ft., Sacks: 250, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA3013 ft.
CODELL3636 ft.
DAKOTA4065 ft.
SHAWNEE6381 ft.
LANSING6602 ft.
MARMATON6960 ft.
CHEROKEE7070 ft.
MORROW V-117722 ft.
KEYES7783 ft.

Formation MRRW                     Formation Classification:  OW                     Status:  AB - 5/1/2013                  Interval Top: 7768 ft.    Interval Bottom: 7782 ft.

 Completed Information for Formation MORROW
1st Production Date:N/AChoke Size: 
Formation Name:MORROWCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/7/2011
Treatment Summary:Acid Job 33 bbl 12.5% HCL, 44.5 bbl 2.5% KCL
Tubing Size:2.875 in.Tubing Setting Depth:7697 ft.
Tubing Packer Depth:7697 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:SWAB
Hours Tested:8Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 72
CALC_BBLS_H2O 216
Perforation Data:
Interval Top:7768 ft.# Of Holes:52
Interval Bottom:7782 ft.Hole Size:0.25 in.

Formation MRV11                   Formation Classification:  OW                   Status:  CM - 12/11/2013                Interval Top: 7722 ft.    Interval Bottom: 7730 ft.

 Completed Information for Formation MORROW V-11
1st Production Date:1/1/2012Choke Size: 
Formation Name:MORROW V-11Commingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/29/2013Treatment End Date:N/A
Treatment Summary:1-29-13 Set CIBP at 7670' plug and abandoned Morrow V-11 formation
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:12/8/2011
Treatment Summary:No Treatment SWAB only
Tubing Size:2.875 in.Tubing Setting Depth:7742 ft.
Tubing Packer Depth:7742 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/27/2013Test Method:SWAB
Hours Tested:8Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 35
CALC_BBLS_H2O 90
CALC_BBLS_OIL 105
GRAVITY_OIL 35
Perforation Data:
Interval Top:7722 ft.# Of Holes:32
Interval Bottom:7730 ft.Hole Size:0.25 in.

Formation CHRK                     Formation Classification:  OW                     Status:  AB - 5/6/2014                  Interval Top: 7079 ft.    Interval Bottom: 7094 ft.

 Completed Information for Formation CHEROKEE
1st Production Date:N/AChoke Size: 
Formation Name:CHEROKEECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/21/2014Treatment End Date:3/28/2014
Treatment Summary:3-21-2014 Drill out CIBP @ 7060' set CIBP @ 7104' with 2 sks cement perf 7079' - 7094' SWAB recover 48 bbls water 3-34-2014 acid job 36 bbls 15% HCL, 42 bbls KCL SWAB recover 65 bbls water 3-27-2014 acid job 36 bbls 15% HCL, 42 bbls 2% KCL SWAB recover 75 bbls water 3-28-2014 set CIBP @ 7060' with 2 sks cement plug and abandon Cherokee formation
Total fluid used in treatment (bbls):156Max pressure during treatment (psi):500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):72Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):190
Fresh water used in treatment (bbls):84Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/5/2013Treatment End Date:2/6/2013
Treatment Summary:Acid Job 28 bbls 15% HCL, 45 bbls 4% KCL
Total fluid used in treatment (bbls):73Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):28Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):75
Fresh water used in treatment (bbls):45Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/30/2013Treatment End Date:1/31/2013
Treatment Summary:Acid Job 14 bbls 15% HCL, 45 bbls 4% KCL
Total fluid used in treatment (bbls):59Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):14Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):60
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:7009 ft.
Tubing Packer Depth:7009 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/27/2014Test Method:SWAB
Hours Tested:8Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
CALC_BBLS_H2O 75
Perforation Data:
Interval Top:7079 ft.# Of Holes:56
Interval Bottom:7094 ft.Hole Size:0.25 in.

Formation MRTN                     Formation Classification:  OW                     Status:  AB - 4/2/2014                  Interval Top: 6960 ft.    Interval Bottom: 6976 ft.

 Completed Information for Formation MARMATON
1st Production Date:N/AChoke Size: 
Formation Name:MARMATONCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/31/2014Treatment End Date:4/2/2014
Treatment Summary:3-31-2014 acid job 38 bbls 15% HCL, 41 bbls 2% KCL SWAB recover 79 bbls water 4-1-2014 acid job 59 bbls 15% HCL, 56 bbls 2% KCL SWAB recover 72 bbls water 4-2-2014 set CIBP @ 6948' with 2 sks cement plub and abandon Torch formation(top of the Marmaton)
Total fluid used in treatment (bbls):194Max pressure during treatment (psi):1100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):97Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):149
Fresh water used in treatment (bbls):97Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6923 ft.
Tubing Packer Depth:6923 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2014Test Method:SWAB
Hours Tested:8Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 24
CALC_BBLS_H2O 72
Perforation Data:
Interval Top:6960 ft.# Of Holes:46
Interval Bottom:6976 ft.Hole Size:0.25 in.

Formation LNSNG                   Formation Classification:  OW                   Status:  PR - 7/1/2020                  Interval Top: 6920 ft.    Interval Bottom: 6932 ft.

 Completed Information for Formation LANSING
1st Production Date:4/10/2014Choke Size: 
Formation Name:LANSINGCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/2/2014Treatment End Date:4/3/2014
Treatment Summary:4-2-2014, acid job 29 bbls 15% HCL, 41 bbls 2% KCL
Total fluid used in treatment (bbls):70Max pressure during treatment (psi):800
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):29Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):54
Fresh water used in treatment (bbls):41Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6885 ft.
Tubing Packer Depth:6885 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/2/2014Test Method:SWAB
Hours Tested:8Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 8
BTU_GAS 1400
CALC_BBLS_H2O 30
CALC_BBLS_OIL 24
CALC_MCF_GAS 15
GRAVITY_OIL 36
MCF_GAS 5
Perforation Data:
Interval Top:6920 ft.# Of Holes:48
Interval Bottom:6932 ft.Hole Size:0.25 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1302
Total Gas Produced (MCF)1089
GOR836
GOR DeterminationBOE
Average BOE per Day4.073
Average MCFE per Day23.649

 Federal Financial Assurance  i 

 Tribal Well  i No