|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 6/1/2025 Measured TD: 7845 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 6/1/2025 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/6/2016 | | Proposed Depth/Form: | 7845 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CHRK , Formation: CHEROKEE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRRW , Formation: MORROW , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MRTN , Formation: MARMATON , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 318 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 318 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7844 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 215, Top: 6310 ft., Bottom: 7844 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4621 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 265, Top: 3270 ft., Bottom: 4621 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/16/2011 | | Spud Date: | 6/30/2011 | Spud Date Is: | ACTUAL | | Measured TD: | 7845 ft. | Measured PB depth: | 7844 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | Compensated Density Compensated Neutron Caliper
High Resoulution Induction Guard Log Gamma Ray
Radial Cement Bond Log
| | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 318 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 318 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 7844 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 6310 ft., Bottom: 7844 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 3270 ft., Depth: 4621 ft., Bottom: 4621 ft., Sacks: 265, Method: STAGE TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 3077 ft. | | | | | CODELL | 3646 ft. | | | | | DAKOTA | 4080 ft. | | | | | SHAWNEE | 5673 ft. | | | | | LANSING | 6928 ft. | | | Y | | TORCH | 6954 ft. | | | | | PAWNEE | 7012 ft. | | | | | CHEROKEE | 7090 ft. | | | Y | | MORROW | 7618 ft. | | | | | KEYES | 7802 ft. | | | |
Formation MRRW Formation Classification: OW Status: SI - 2/26/2014 Interval Top: 7776 ft. Interval Bottom: 7790 ft.| Completed Information for Formation MORROW | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MORROW | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/20/2014 | Treatment End Date: | N/A | | Treatment Summary: | 2/11/2014 Set CIBP @ 7750' with 2 sks cement, no treatment shut in Morrow formation. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 7/26/2011 | | Treatment Summary: | Acid Job 1400 gal 12% HCL acid 44 bbls 4% KCL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 12 | | CALC_BBLS_OIL | 36 | | GRAVITY_OIL | 35 |
| | Perforation Data: | | Interval Top: | 7776 ft. | # Of Holes: | 61 | | Interval Bottom: | 7790 ft. | Hole Size: | 0.25 in. |
|
Formation CHRK Formation Classification: OW Status: SI - 6/1/2025 Interval Top: 7102 ft. Interval Bottom: 7112 ft.| Completed Information for Formation CHEROKEE | | 1st Production Date: | 2/14/2014 | Choke Size: | | | Formation Name: | CHEROKEE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 2/11/2014 | Treatment End Date: | 2/12/2014 | | Treatment Summary: | Acid Job 24 bbls 15% HCL, 42 bbls 2% KCL | | Total fluid used in treatment (bbls): | 66 | Max pressure during treatment (psi): | 500 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 85 | | Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7036 ft. | | Tubing Packer Depth: | 7036 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/11/2014 | Test Method: | SWAB | | Hours Tested: | 8 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1400 | | CALC_BBLS_OIL | 24 | | CALC_MCF_GAS | 30 | | GRAVITY_OIL | 38 | | MCF_GAS | 10 |
| | Perforation Data: | | Interval Top: | 7102 ft. | # Of Holes: | 40 | | Interval Bottom: | 7112 ft. | Hole Size: | 0.25 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 11 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.005 |
| Average MCFE per Day | 0.030 |
| Federal Financial Assurance | i | |
|
|