COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400105327
11/9/2010
1) Provide 24 hour notice of MIRU to Craig Quint at 719-767-8939 or e-mail at craig.quint@state.co.us. 2) If production casing is set provide cement coverage to at least 200’ above shallowest completed interval (200’ above CHRK at a minimum), and stage cement Cheyenne/Dakota interval (4600’-3950’ minimum). Run and submit CBL to verify cemented intervals. 3) If well is a dry hole set plugs at the following depths: 40 sks cement +/- 50’ above the Atoka, 40 sks cement across any DST w/ show, 40 sks cement 50’ below Cheyenne (4600’ up), 40 sks cement 50’ above top of Dakota (3950’ up), 50 sks cement from 50’ below surface casing shoe up into surface casing, 15 sks cement in top of surface casing, cut 4 ft below GL, weld on plate, 5 sks cement each in rat hole and mouse hole.
EnvironmentalForm: (04 )
400961318
12/31/2015
Operator will submit Form 27 remediation plan by February 29, 2016. No form 19 spill report will be required.
Reclamation SpecialistForm: (04 )
402822666
12/20/2021
COGCC will not require further action at this time. If any future disturbances (i.e., subsequent operations) affect interim reclamation vegetation, Operator shall reclaim all disturbances as early as practicable to meet Rule 1003 standards. Should future conditions at the site indicate poor growth that is not reflective of reference areas, then further investigation and reclamation activities may be required.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02 )
400538388
2/7/2014
No additional surface disturbance for recompletion operations