Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-069-06254
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Hearthfire #1 (OWP)
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PROSPECT ENERGY LLC - 10312
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:217067LocationID:333083
County:LARIMER #069Location:NWNW 30 8N68W 6
Field:FORT COLLINS - #25100Elevation:5118 ft.
Planned Location:393FNL  1041 FWLLat/Long: 40.638260 / -105.053377Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.638326 / -105.053377Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/12/2012
End Date: 10/12/2012
Reported: 11/27/2012
Days to report: 46
Disclosure: Sidetrack #00
Start Date: 5/1/2017
End Date: 5/1/2017
Reported: 6/5/2017
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 4599 ft.    Vertical TD: 4595 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/4/2019
Proposed Top PZ Location:Sec:30 Twp: 8N 68W Footage: 360 FNL  1080 FWL
Bottom Hole Location:Sec:30 Twp: 8N 68W Footage: 319 FNL  1143 FWL
Proposed Depth/Form:4663 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: MDDY , Formation: MUDDY , Order: 84-2 , Unit Acreage: 0, Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 433 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 240, Top: 0 ft., Bottom: 433 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 3410 ft., Depth: 4655 ft., Weight: 14 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 3410 ft., Bottom: 4655 ft.

Wellbore Completed
Completion Date:8/25/1985
Spud Date:7/9/1985Spud Date Is:ACTUAL
Measured TD:4599 ft.Measured PB depth:3975 ft.
True Vertical TD:4595 ft.True Vertical PB depth:3973 ft.
Top PZ Location:Sec:30 Twp: 8N 68WFootage: 360 FNL  1080 FWL
Bottom Hole Location:Sec:30 Twp: 8N 68WFootage: 319 FNL  1143 FWL
Log Types:CASING INSPECTION, CEMENT EVALUATION (DIL W/SP CNL/CDL W/GR, CBL COMPLETED IN 1985)
Log Types:DIL W/SP, CNL/CDL W/GR & CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 429 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 0 ft., Bottom: 429 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4599 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 3410 ft., Bottom: 4599 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
HYGIENE0 ft.
NIOBRARA3640 ft.
TIMPAS3964 ft.
CODELL3985 ft.
GREENHORN4064 ft.
BENTONITE4258 ft.
MUDDY4430 ft.
MUDDY-SKULL CREEK4481 ft.
SKULL CREEK4560 ft.

Formation MDDY                     Formation Classification:  OW                     Status:  AB - 3/31/2025                 Interval Top: 4483 ft.    Interval Bottom: 4535 ft.

 Completed Information for Formation MUDDY
1st Production Date:8/25/1985Choke Size: 
Formation Name:MUDDYCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/27/1989
Treatment Summary:3,000 GAL 15% HCL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 234
Perforation Data:
Interval Top:4483 ft.# Of Holes:52
Interval Bottom:4535 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  AB - 3/31/2025                 Interval Top: 3989 ft.    Interval Bottom: 3997 ft.

 Completed Information for Formation CODELL
1st Production Date:5/3/2017Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/28/2017Treatment End Date:5/1/2017
Treatment Summary:27 bbls of Fresh Water, 12 bbls of 15% HCl, 231 bbls of 30 Lb Linear Gel, 1,070 bbls of 30 lb Xlink Gel, 742 bbls of 25 Lb Xlink Gel, 87 bbls of Gel Water Flush for a total of 2,169 bbls of Total Fluid.
Total fluid used in treatment (bbls):2181Max pressure during treatment (psi):6403
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):2169
Fresh water used in treatment (bbls):2169Disposition method For flowback:DISPOSAL
Total proppant used (lbs):93700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 50
BTU_GAS 1100
CALC_BBLS_H2O 10
CALC_BBLS_OIL 50
CALC_GOR 2000
CALC_MCF_GAS 100
CASING_PRESS 3400
GRAVITY_OIL 38
MCF_GAS 100
TUBING_PRESS 5000
Perforation Data:
Interval Top:3989 ft.# Of Holes:24
Interval Bottom:3997 ft.Hole Size:0.46 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  CM - 7/28/2022                 Interval Top: 3654 ft.    Interval Bottom: 3997 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:5/3/2017Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/28/2022Treatment End Date:N/A
Treatment Summary:Please refer to Doc#401278278 (Codell) and 400345937 (Niobrara).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:3654 ft.# Of Holes:138
Interval Bottom:3997 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  AB - 3/31/2025                 Interval Top: 3654 ft.    Interval Bottom: 3784 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/4/2010Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:10/12/2012Treatment End Date:10/12/2012
Treatment Summary:Please refer to Doc#401278278 (Codell) and 400345937 (Niobrara).
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:12/4/2010
Treatment Summary:PERFORATION INTERVALS: 3654-3660',3670'-3676',3682'-3686',3746'-3752',3764'-3768',3772'-3784' PUMPED 61 BBLS 10% HCL ACID, DROPPED 175 BIOSEALER BALLS, 20 BBLS TREATED WATER PAD, 25 BBLS 5% KCL FLUSH
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 96
BBLS_OIL 17
BTU_GAS 1229
CALC_BBLS_H2O 96
CALC_BBLS_OIL 17
CALC_GOR 1294
CALC_MCF_GAS 22
CASING_PRESS 40
GRAVITY_OIL 36
MCF_GAS 22
TUBING_PRESS 40
Perforation Data:
Interval Top:3654 ft.# Of Holes:114
Interval Bottom:3784 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No