Dust control | Form: (02 ) 401134609 4/5/2017 | Dust: - Entrance to the location is from a paved road. Prospect will use water on the location as needed to reduce dust. Location of well is covered by “crushed asphalt”. |
Construction | Form: (02 ) 401134609 4/5/2017 | Light: - Only night time operations will be well production and flow back. If any light towers are utilized, the lights will be pointed down towards the location. |
Noise mitigation | Form: (02 ) 401134609 4/5/2017 | Noise - Prospect Energy will point completion rig and completion engine exhausts away from Building Units and will arrange for frac crews to make best attempt to reduce noise including to set-up and stage equipment to try an block/shield noisy equipment.
|
Odor mitigation | Form: (02 ) 401134609 4/5/2017 | Odor: - Prospect will work to reduce odor. Gas produced during production and flow back will be flared or incinerated in burner units or a flare box. |
Drilling/Completion Operations | Form: (02 ) 401134609 4/5/2017 | Flowback procedures: - flowback of well will be into a separation vessel. Oil and water will be handled by field production equipment. Gas produced will be flared or incinerated in a burner unit or flare box. |
Drilling/Completion Operations | Form: (02 ) 401134609 4/5/2017 | Completion procedures: - Workover rig will be utilized to set a work string for the stimulation. Stimulation crew will treat the well with a single stage. Estimated time for the stimulation crew to be on location is <8 hours. Rig will likely not be on location during the stimulation or initial flow back. Annulus pressure will be monitored during the treatment. |
Emissions mitigation | Form: (04 ) 403179304 2/16/2023 | During maintenance or repair, one combustor remains operational and has capacity for the field gas. |
Emissions mitigation | Form: (04 ) 403179304 2/16/2023 | The two combustors have continuously operating pilot lights and are inspected and monitored daily. |