WELL05-069-06254Hearthfire
1 (OWP)
PROSPECT ENERGY LLC
10312
PR
8/1/2023
FORT COLLINS
25100
LARIMER  069
NWNW 30 8N68W 6
333083View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
Data EntryForm: (05 )
2592683
3/9/2011
FORMATION MUDDY = MUDDY SILT MUDDY SS = MUDDY SKULL CREEK
EngineerForm: (02 )
401134609
1/22/2017
Bradenhead tests shall be performed and reported according to the following schedule and Form 17 submitted within 10 days of each test.: 1) Prior to stimulation. 2) Within 30 days of first production, as reported on Form 5A.
EnvironmentalForm: (04 )
402143980
4/1/2021
All future sampling results related to Venting and flaring will be submitted through the Form 43 (Analytical Sample Submittal) process using an Electronic Data Deliverable (EDD) in an approved COGCC format provided by the laboratory.
EngineerForm: (04 )
402143980
2/16/2023
Flaring after January 15, 2022 requires an approved Gas Capture Plan or an approved Variance.
EngineerForm: (04 )
403179304
2/16/2023
This well should be shut in until a Gas Capture Plan or Variance is approved. Approval was to have been received prior to January 15, 2022.
EngineerForm: (04 )
403899413
8/23/2024
Bradenhead test to be completed prior to beginning temporary abandonment. If pressure greater than 25# prior to opening valve, sampling is required. Contact ECMC for sampling.
EngineerForm: (04 )
403899413
8/23/2024
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (04 )
403899413
8/23/2024
Operator shall institute measures to prevent spills.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Dust controlForm: (02 )
401134609
4/5/2017
Dust: - Entrance to the location is from a paved road. Prospect will use water on the location as needed to reduce dust. Location of well is covered by “crushed asphalt”.
ConstructionForm: (02 )
401134609
4/5/2017
Light: - Only night time operations will be well production and flow back. If any light towers are utilized, the lights will be pointed down towards the location.
Noise mitigationForm: (02 )
401134609
4/5/2017
Noise - Prospect Energy will point completion rig and completion engine exhausts away from Building Units and will arrange for frac crews to make best attempt to reduce noise including to set-up and stage equipment to try an block/shield noisy equipment.
Odor mitigationForm: (02 )
401134609
4/5/2017
Odor: - Prospect will work to reduce odor. Gas produced during production and flow back will be flared or incinerated in burner units or a flare box.
Drilling/Completion OperationsForm: (02 )
401134609
4/5/2017
Flowback procedures: - flowback of well will be into a separation vessel. Oil and water will be handled by field production equipment. Gas produced will be flared or incinerated in a burner unit or flare box.
Drilling/Completion OperationsForm: (02 )
401134609
4/5/2017
Completion procedures: - Workover rig will be utilized to set a work string for the stimulation. Stimulation crew will treat the well with a single stage. Estimated time for the stimulation crew to be on location is <8 hours. Rig will likely not be on location during the stimulation or initial flow back. Annulus pressure will be monitored during the treatment.
Emissions mitigationForm: (04 )
403179304
2/16/2023
During maintenance or repair, one combustor remains operational and has capacity for the field gas.
Emissions mitigationForm: (04 )
403179304
2/16/2023
The two combustors have continuously operating pilot lights and are inspected and monitored daily.