Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-057-06605
Well Classification: OW Status: PR - 4/1/2025
Well Name/No:Janet 0780 #4-16H21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FULCRUM ENERGY OPERATING LLC - 10805
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2025
FacilityID:452321LocationID:439603
County:JACKSON #057Location:NWNW 16 7N80W 6
Field:NORTH PARK HORIZONTAL NIOBRARA - #60120Elevation:8127 ft.
Basin:NORTH PARK BASIN  
Planned Location:159FNL  188 FWLLat/Long: 40.584280 / -106.387350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.584277 / -106.387350Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/27/2018
End Date: 7/10/2018
Reported: 7/20/2018
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2025             Measured TD: 18190 ft.    Vertical TD: 7492 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/25/2019
Proposed Top PZ Location:Sec:16 Twp: 7N 80W Footage: 727 FNL  1755 FWL
Bottom Hole Location:Sec:21 Twp: 7N 80W Footage: 105 FSL  1723 FWL
Proposed Depth/Form:18236 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 531-52 , Unit Acreage: 1281, Drill Unit: W/2 4, 9, 16, 21
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16.25 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: PLANNED
Cement:Sacks: 189, Top: 0 ft., Bottom: 90 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 629, Top: 0 ft., Bottom: 2400 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18321 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 3095, Top: 0 ft., Bottom: 18321 ft.

Wellbore Completed
Completion Date:2/19/2018
Spud Date:2/3/2018Spud Date Is:ACTUAL
Measured TD:18190 ft.Measured PB depth:18034 ft.
True Vertical TD:7492 ft.True Vertical PB depth:7510 ft.
Top PZ Location:Sec:16 Twp: 7N 80WFootage: 727 FNL  1755 FWL
Bottom Hole Location:Sec:21 Twp: 7N 80WFootage: 105 FSL  1723 FWL
Log Types:Mud, CBL, LWD/MWD, (partial Triple Combo in 057-06539)
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 115 ft., Weight: 133 , Citings Type: ACTUAL
Cement:Sacks: 72, Top: 0 ft., Bottom: 115 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2434 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 2434 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18190 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3255, Top: 1886 ft., Bottom: 18190 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
LANCE3288 ft.
FOX HILLS4077 ft.
PIERRE4512 ft.
SUSSEX5563 ft.
SHANNON6216 ft.
MANCOS7381 ft.
NIOBRARA7720 ft.
CARLILE14730 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/1/2023                  Interval Top: 14737 ft.    Interval Bottom: 16323 ft.

 Completed Information for Formation CARLILE
1st Production Date:9/27/2018Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/27/2018Treatment End Date:7/10/2018
Treatment Summary:Completed Depths: 14737 - 16323 MD (7826-7685 VD)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:14737 ft.# Of Holes:150
Interval Bottom:16323 ft.Hole Size:0.42 in.

Formation CARLNB                 Formation Classification:  OW                 Status:  PR - 4/1/2025                  Interval Top: 8418 ft.    Interval Bottom: 18014 ft.

 Completed Information for Formation CARLILE-NIOBRARA
1st Production Date:9/27/2018Choke Size:0.000 in.
Formation Name:CARLILE-NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/27/2018Treatment End Date:7/10/2018
Treatment Summary:Plug & Perf Completion: 1,914 bbls of 15% NEFE HCL Acid, 235,139 bbls of fluid, and 1,328,560 lbs of 40/70 and 8,137,165 lbs of 20/40 proppant.
Total fluid used in treatment (bbls):237053Max pressure during treatment (psi):8619
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):1914Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):42544
Fresh water used in treatment (bbls):235139Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9465725Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:8004 ft.
Tubing Packer Depth:7998 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/17/2018Test Method:
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 1368
BBLS_OIL 528
BTU_GAS 1576
CALC_BBLS_H2O 1368
CALC_BBLS_OIL 528
CALC_GOR 795
CALC_MCF_GAS 420
CASING_PRESS 413
GRAVITY_OIL 38
MCF_GAS 420
TUBING_PRESS 2741
Perforation Data:
Interval Top:8418 ft.# Of Holes:1200
Interval Bottom:18014 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/1/2024                 Interval Top: 8418 ft.    Interval Bottom: 18015 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/27/2018Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:6/27/2018Treatment End Date:7/10/2018
Treatment Summary:Completed Depths: 8418 – 14689 MD (7738 - 7826 VD); 16323 - 18015 MD (7734-7685 VD)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1368
BBLS_OIL 528
BTU_GAS 1576
CALC_BBLS_H2O 1368
CALC_BBLS_OIL 528
CALC_GOR 795
CALC_MCF_GAS 420
CASING_PRESS 413
GRAVITY_OIL 38
MCF_GAS 420
TUBING_PRESS 2741
Perforation Data:
Interval Top:8418 ft.# Of Holes:1050
Interval Bottom:18015 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)3834
Total Gas Produced (MCF)4615
GOR1203
GOR DeterminationBOE
Average BOE per Day12.634
Average MCFE per Day73.290

 Federal Financial Assurance  i 

 Tribal Well  i No