|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/1/2024 Measured TD: 9482 ft. Vertical TD: 9164 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/8/2020 | | Proposed Top PZ Location: | Sec:15 Twp: 5S 96W | Footage: 698 FNL 1226 FEL | | Bottom Hole Location: | Sec:15 Twp: 5S 96W | Footage: 724 FNL 1351 FEL | | Proposed Depth/Form: | 9513 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 562, Top: 0 ft., Bottom: 2000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9492 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 1181, Top: 2806 ft., Bottom: 9492 ft. | | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 10365 ft., Weight: 12 , Citings Type: PLANNED | | Cement: | Sacks: 532, Top: , Bottom: 10365 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/26/2018 | | Spud Date: | 8/19/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 9482 ft. | Measured PB depth: | 9410 ft. | | True Vertical TD: | 9164 ft. | True Vertical PB depth: | 9092 ft. | | Top PZ Location: | Sec:15 Twp: 5S 96W | Footage: 698 FNL 1226 FEL | | Bottom Hole Location: | Sec:15 Twp: 5S 96W | Footage: 724 FNL 1351 FEL | | Log Types: | CBL, Pulsed Neutron, (Triple Combo on 045-21085). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2365 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 705, Top: 0 ft., Bottom: 2365 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9458 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 3390 ft., Bottom: 9458 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREEN RIVER | 0 ft. | | N | N | | WASATCH | 1570 ft. | | N | N | | WASATCH G | 3528 ft. | | N | N | | FORT UNION | 4038 ft. | | N | N | | OHIO CREEK | 5365 ft. | | N | N | | WILLIAMS FORK | 5636 ft. | | N | N | | CAMEO | 8661 ft. | | N | N | | ROLLINS | 9323 ft. | | N | N |
Formation WMFK Formation Classification: GW Status: PR - 7/1/2024 Interval Top: 5854 ft. Interval Bottom: 8409 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 3/21/2019 | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 3/16/2019 | Treatment End Date: | 3/20/2019 | | Treatment Summary: | 10-stage plug-and-perf completion;
80015 total bbls fluid pumped: 34214 bbls fresh water (slickwater), 45682 bbls recycled water (slickwater), and 167 bbls 7.5% HCl acid;
no proppant used.
| | Total fluid used in treatment (bbls): | 80015 | Max pressure during treatment (psi): | 8077 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.41 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | 119 | Min frac gradient (psi/ft): | 0.91 | | Recycled water used in treatment (bbls): | 45682 | Total flowback volume recovered (bbls): | 26624 | | Fresh water used in treatment (bbls): | 34214 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7780 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/21/2019 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3024 | | BTU_GAS | 1050 | | CALC_BBLS_H2O | 3024 | | CALC_MCF_GAS | 168 | | CASING_PRESS | 1702 | | MCF_GAS | 168 |
| | Perforation Data: | | Interval Top: | 5854 ft. | # Of Holes: | 270 | | Interval Bottom: | 8409 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 210 |
| Total Gas Produced (MCF) | 37211 |
| GOR | 177195 |
| GOR Determination | MCFE |
| Average BOE per Day | 18.152 |
| Average MCFE per Day | 105.316 |
| Federal Financial Assurance | i | |
|
|