Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15032
Well Classification: GW Status: PR - 8/1/2024
Well Name/No:SGU #CP11D-27 L27 49
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC-68711
Facility Status:PRStatus Date8/1/2024
FacilityID:293528LocationID:335939
County:GARFIELD #045Location:NWSW 27 4S96W 6
Field:GRAND VALLEY - #31290Elevation:8109 ft.
Basin:PICEANCE BASIN  
Planned Location:2058FSL  1222 FWLLat/Long: 39.671714 / -108.159792Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.671713 / -108.159793Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2024             Measured TD: 11576 ft.    Vertical TD: 11436 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20075193 Expiration Date:11/14/2008
Proposed Top PZ Location:Sec:27 Twp: 4S 96W Footage: 1662 FSL  2359 FWL
Bottom Hole Location:Sec:27 Twp: 4S 96W Footage: 1662 FSL  2359 FWL
Proposed Depth/Form:12654 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit:STORY GULCH UNI Unit Number:COC-69333X
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/5/2008
Spud Date:6/27/2008Spud Date Is:ACTUAL
Measured TD:11576 ft.Measured PB depth:11500 ft.
True Vertical TD:11436 ft.True Vertical PB depth:11360 ft.
Top PZ Location:Sec:27 Twp: 4S 96WFootage: 1662 FSL  2359 FWL
Bottom Hole Location:Sec:27 Twp: 4S 96WFootage: 1662 FSL  2359 FWL
Log Types:CBL (W/G.R., VDL) -- 2; MUD; G.R. - CCL -- TEMP
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 99 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 140, Top: 0 ft., Bottom: 99 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2404 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1368, Top: 0 ft., Bottom: 2404 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5414 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 7667, Top: 0 ft., Bottom: 7667 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 11576 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 347, Top: 6690 ft., Bottom: 11576 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH5883 ft.NN
OHIO CREEK7145 ft.NN
WILLIAMS FORK7578 ft.NN
CAMEO10926 ft.NN
ROLLINS11576 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 8/1/2024                  Interval Top: 8341 ft.    Interval Bottom: 11364 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:N/AChoke Size: 
Formation Name:WILLIAMS FORKCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/18/2013Treatment End Date:N/A
Treatment Summary:CIBP SET @ 8333' W/ 2 SX SAND, WHICH COVERS THE WILLIAMS FORK PERFS @ 8341'- 11364'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/1/2008
Treatment Summary:FRACTURED WITH: 71793 BBLS SLICK WATER, 263165 LBS 100 MESH, 193639 LBS 40/80 HYDROPROP, 1104680 LBS 20/40 JORDAN UNIMIN
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1329
BBLS_OIL 0
BTU_GAS 1090
CALC_BBLS_H2O 1329
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 700
CASING_PRESS 3850
MCF_GAS 700
TUBING_PRESS 1775
Perforation Data:
Interval Top:8341 ft.# Of Holes:267
Interval Bottom:11364 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)75
Total Gas Produced (MCF)38865
GOR518200
GOR DeterminationMCFE
Average BOE per Day18.541
Average MCFE per Day107.540

 Federal Financial Assurance  i Y

 Tribal Well  i No