Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11347
Well Classification: GW Status: TA - 2/20/2018
Well Name/No:N.PARACHUTE #WF05D K10 596
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date2/20/2018
FacilityID:280762LocationID:335676
County:GARFIELD #045Location:NESW 10 5S96W 6
Field:GRAND VALLEY - #31290Elevation:6695 ft.
Basin:PICEANCE BASIN  
Planned Location:1797FSL  2583 FWLLat/Long: 39.627196 / -108.155659Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.627289 / -108.155667Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 2/20/2018             Measured TD: 9627 ft.    Vertical TD: 9255 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 2/20/2018
Wellbore PermitDIRECTIONAL
Permit #:20053411 Expiration Date:10/19/2006
Proposed Top PZ Location:Sec:10 Twp: 5S 96W Footage: 2295 FNL  1079 FWL
Bottom Hole Location:Sec:10 Twp: 5S 96W Footage: 2295 FNL  1079 FWL
Proposed Depth/Form:10878 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-15 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/21/2006
Spud Date:4/27/2006Spud Date Is:ACTUAL
Measured TD:9627 ft.Measured PB depth:9569 ft.
True Vertical TD:9255 ft.True Vertical PB depth:9197 ft.
Top PZ Location:Sec:10 Twp: 5S 96WFootage: 2295 FNL  1079 FWL
Bottom Hole Location:Sec:10 Twp: 5S 96WFootage: 2295 FNL  1079 FWL
Log Types:CBL WILL SEND ELECTRONIC MUD LOG,PAPER COPY NOT AVAILABEL AT THIS TIME.
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 138 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 138 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2507 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 855, Top: 0 ft., Bottom: 2012 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 9615 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1646, Top: 2100 ft., Bottom: 9615 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH4006 ft.5989 ft.NN
WILLIAMS FORK5989 ft.9536 ft.NN
ROLLINS9536 ft.9627 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  TA - 2/20/2018                 Interval Top: 6240 ft.    Interval Bottom: 9397 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:6/27/2006Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/12/2006
Treatment Summary:SEE SCANNED DOCUMENT
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 161
CASING_PRESS 2104
MCF_GAS 161
TUBING_PRESS 212
Perforation Data:
Interval Top:6240 ft.# Of Holes:195
Interval Bottom:9397 ft.Hole Size:0.34 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
11/30/2017
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No