Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-11038
Well Classification: GW Status: PR - 10/1/2024
Well Name/No:CHEVRON #18-444D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:279437LocationID:335161
County:GARFIELD #045Location:NWNW 20 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5830 ft.
Basin:PICEANCE BASIN  
Planned Location:1161FNL  849 FWLLat/Long: 39.513758 / -108.138988Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.513887 / -108.138881Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2024             Measured TD: 7355 ft.    Vertical TD: 7060 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20052523 Expiration Date:8/17/2006
Proposed Top PZ Location:Sec:18 Twp: 6S 96W Footage: 334 FSL  227 FEL
Bottom Hole Location:Sec:18 Twp: 6S 96W Footage: 334 FSL  227 FEL
Proposed Depth/Form:8190 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/4/2006
Spud Date:12/20/2005Spud Date Is:ACTUAL
Measured TD:7355 ft.Measured PB depth:
True Vertical TD:7060 ft.True Vertical PB depth:
Top PZ Location:Sec:18 Twp: 6S 96WFootage: 334 FSL  227 FEL
Bottom Hole Location:Sec:18 Twp: 6S 96WFootage: 334 FSL  227 FEL
Log Types:SCHLUMBERGER PLATFORM EXPRESS ARRAY INDUCTION GAMMA RAY/SP, CBL/TEMP/GR/CCL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 90 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 17 ft., Depth: 2510 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 0 ft., Bottom: 2510 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 17 ft., Depth: 7313 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1365, Top: 2240 ft., Bottom: 7313 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK4204 ft.7244 ft.NN
ROLLINS7244 ft.NN

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 10/1/2024                 Interval Top: 5128 ft.    Interval Bottom: 7086 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:5/1/2006Choke Size:0.219 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2006
Treatment Summary:5,250 GALS 7.5% HCL; 1,028,000# 20/40 OTTAWA SAND; 25,788 BBLS SLICKWATER. PLEASE SEE ATTACHMENTS.
Tubing Size:2.375 in.Tubing Setting Depth:6930 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/9/2006Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1600
CASING_PRESS 2200
MCF_GAS 1600
TUBING_PRESS 2050
Perforation Data:
Interval Top:5128 ft.# Of Holes:160
Interval Bottom:7086 ft.Hole Size:0.32 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)89
Total Gas Produced (MCF)49234
GOR553191
GOR DeterminationMCFE
Average BOE per Day23.508
Average MCFE per Day136.342

 Federal Financial Assurance  i 

 Tribal Well  i No