|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/1/1995 Measured TD: 6530 ft. Vertical TD: 6528 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/1/1995 | | Wellbore Permit | | | Permit #: | 890983 | Expiration Date: | 3/6/1990 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: 0 , Unit Acreage: 160, Drill Unit: SE4 |
| | |
| Wellbore Completed | | Completion Date: | 1/23/1990 | | Measured TD: | 6530 ft. | Measured PB depth: | 6447 ft. | | True Vertical TD: | 6528 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.5 in., Size: 8.625 in., Top: 0 ft., Depth: 324 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 324 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6495 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 2723 ft., Bottom: 6495 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 2723 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 450, Top: 1900 ft., Bottom: 2723 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FORT UNION | 1971 ft. | | | | | MESAVERDE | 3311 ft. | | | | | CAMEO COAL | 5834 ft. | | | | | ROLLINS | 6339 ft. | | | |
Formation CMEOC Formation Classification: GW Status: CM - 1/29/1990 Interval Top: 5834 ft.| Completed Information for Formation CAMEO COAL | | 1st Production Date: | N/A | Choke Size: | 1,264.000 in. | | Formation Name: | CAMEO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CMEOC. |
| | No Perforation Data was found for formation CMEOC. |
|
Formation WFCM Formation Classification: GW Status: PR - 10/1/1995| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | No Perforation Data was found for formation WFCM. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 11 |
| Total Gas Produced (MCF) | 6313 |
| GOR | 573909 |
| GOR Determination | MCFE |
| Average BOE per Day | 3.009 |
| Average MCFE per Day | 17.478 |
| Federal Financial Assurance | i | |
|
|