| 404504165 | Form 17 | 1/6/2026 | 1/13/2026 | CLOCK/INTERMITTER | 36 | CONTINUOUS | GAS | 0 | WHISPER | 97 | 97 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected
to the sales line with an approved pressure management plan. The test was performed through a 1 inch valve. |
| 404061974 | Form 17 | 1/16/2025 | 1/17/2025 | CLOCK/INTERMITTER | 42 | CONTINUOUS | GAS | 0 | WHISPER | 97 | 99 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403893776 | Form 17 | 8/15/2024 | 8/19/2024 | CLOCK/INTERMITTER | 45 | CONTINUOUS | GAS | 0 | WHISPER | 106 | 107 | No | -- | -- | This bradenhead test is being submitted to satisfy a COA attached to Doc# 403793246. This test was performed after implementing the approved Pressure Management Plan which connected the bradenhead to the sales line. The test was performed after shutting-in the bradenhead connection for seven days. The test was performed through a one-inch valve. |
| 403745733 | Form 17 | 4/5/2024 | 4/8/2024 | PLUNGER LIFT | 98 | CONTINUOUS | GAS | 0 | WHISPER | 150 | 151 | No | -- | -- | The test was performed through a 1" valve. |
| Click for Specifics | Full | 1/30/2024 | 2/5/2024 | Plunger Lift | 29 | N/A | -- | 0 | No Flow | 137 | 140 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 1/30/2023 | 2/7/2023 | Plunger Lift | 28 | N/A | -- | 0 | No Flow | 138 | 142 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 2/22/2022 | 3/7/2022 | Plunger Lift | 24 | N/A | -- | 0 | No Flow | 194 | 196 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 6/17/2021 | 7/12/2021 | Plunger Lift | 22 | N/A | -- | 0 | No Flow | 195 | 195 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 0 | | -- | -- | No | No | No | |