Wellbore #00 Wellbore Classification: OW Status: AB - 6/13/2023 Measured TD: 4514 ft. Vertical TD: 4110 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 6/13/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/29/2012 | | Proposed Top PZ Location: | Sec:29 Twp: 19s 69W | Footage: 2226 FNL 1926 FEL | | Bottom Hole Location: | Sec:29 Twp: 19S 69W | Footage: 2473 FSL 1144 FEL | | Proposed Depth/Form: | 5485 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 50 ft., Weight: .25 , Citings Type: PLANNED | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 50 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 700 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 180, Top: 0 ft., Bottom: 700 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 4400 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 3450 ft., Bottom: 4400 ft. | | Casing: | String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 5485 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 6/24/2010 | | Spud Date: | 6/14/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 4514 ft. | Measured PB depth: | 4514 ft. | | True Vertical TD: | 4110 ft. | True Vertical PB depth: | 4110 ft. | | Top PZ Location: | Sec:29 Twp: 19s 69W | Footage: 2226 FNL 1926 FEL | | Bottom Hole Location: | Sec:29 Twp: 19S 69W | Footage: 2473 FSL 1144 FEL | | Log Types: | Gamma Ray
Array Induction
Caliper
Temperature | | Log Types: | GAMMA RAY, ARRAY INDUCTION, CALIPER, TEMPERATURE, CEMENT BOND | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 65 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 39, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 720 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 331, Top: 0 ft., Bottom: 720 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 3870 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 1900 ft., Bottom: 3870 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 6.25 in., Size: , Top: 3870 ft., Depth: 4514 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 3690 ft., Depth: 3798 ft., Bottom: 3798 ft., Sacks: 48, Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 3826 ft., Depth: 3790 ft., Bottom: 3967 ft., Sacks: 43, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 0 ft. | 3944 ft. | | | | NIOBRARA | 3944 ft. | 4514 ft. | N | |
Formation NBRR Formation Classification: OW Status: AB - 6/13/2023 Interval Top: 3944 ft. Interval Bottom: 4514 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 7/21/2010 | | Treatment Summary: | No stimulation/treatment conducted. | | Formation Treatment | | Treatment Date: | 7/1/2010 | | Treatment Summary: | No Stimulation/treatment conducted. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 3944 ft. | # Of Holes: | 0 | | Interval Bottom: | 4514 ft. | Hole Size: | |
|
Formation PRRE Formation Classification: OW Status: AB - 6/13/2023 Interval Top: 2839 ft. Interval Bottom: 3380 ft.| Completed Information for Formation PIERRE | | 1st Production Date: | 7/21/2010 | Choke Size: | | | Formation Name: | PIERRE | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/13/2010 | | Treatment Summary: | Initial perforations from 3,512' to 3,552', no fluid entry detected. Acidized with 500 gal 7.5% HCL, 600 gal 6% HCL / 1.5% HF
followed by 3 bbls 3% Amm. Cl. and displaced with 9 bbls Amm. Cl. Set CIBP at 3,500' and perofrated 2,839' to 3,380'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| GRAVITY_OIL | 31 |
| | Perforation Data: | | Interval Top: | 2839 ft. | # Of Holes: | 146 | | Interval Bottom: | 3380 ft. | Hole Size: | 3.125 in. |
|
Sidetrack #01 Wellbore Classification: OW Status: AB - 6/13/2023 Measured TD: 4376 ft. Vertical TD: 3138 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW AB - 6/13/2023 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 10/25/2014 | | Proposed Top PZ Location: | Sec:29 Twp: 19S 69W | Footage: 1958 FNL 2291 FEL | | Bottom Hole Location: | Sec:29 Twp: 19S 69W | Footage: 2083 FNL 576 FEL | | Proposed Depth/Form: | 4500 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: PRRE , Formation: PIERRE , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 65 ft., Weight: .25 , Citings Type: PLANNED | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 65 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 720 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 720 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 3870 ft., Weight: 23 , Citings Type: PLANNED | | Cement: | Sacks: 105, Top: 0 ft., Bottom: 3870 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/3/2013 | | Spud Date: | 2/3/2013 | Spud Date Is: | Actual | | Measured TD: | 4376 ft. | Measured PB depth: | | | True Vertical TD: | 3138 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:29 Twp: 19S 69W | Footage: 1958 FNL 2291 FEL | | Bottom Hole Location: | Sec:29 Twp: 19S 69W | Footage: 2083 FNL 576 FEL | | Log Types: | | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 65 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 720 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 331, Top: , Bottom: 720 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 2380 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 3400 ft., Bottom: 3870 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 3.5 in., Top: 1976 ft., Depth: 3854 ft., Weight: 13.3 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 0 ft. | 4376 ft. | N | N |
Formation PRRE Formation Classification: OW Status: AB - 6/13/2023 Interval Top: 2380 ft. Interval Bottom: 4376 ft.| Completed Information for Formation PIERRE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | PIERRE | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 2/27/2013 | Treatment End Date: | N/A | | Treatment Summary: | SIDE TRACK NEVER PRODUCED DUE TO FORMATION DAMAGE | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | | | Treatment Date: | 10/31/2012 | Treatment End Date: | N/A | | Treatment Summary: | Pump cement to sidetrack | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation PRRE. |
| | Perforation Data: | | Interval Top: | 2380 ft. | # Of Holes: | | | Interval Bottom: | 4376 ft. | Hole Size: | 8.75 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/13/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|