Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20749
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S19-25-11C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:455307LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5324 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2331FSL  1348 FELLat/Long: 39.978561 / -105.039480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978563 / -105.039478Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/9/2020
End Date: 1/17/2020
Reported: 1/27/2020
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21226 ft.    Vertical TD: 8379 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/31/2020
Proposed Top PZ Location:Sec:7 Twp: 1S 68W Footage: 2405 FSL  1465 FEL
Bottom Hole Location:Sec:19 Twp: 1S 68W Footage: 505 FSL  1517 FEL
Proposed Depth/Form:21219 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2274 , Unit Acreage: 1600, Drill Unit: 7: S/2, 18 & 19: ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21219 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2873, Top: 1500 ft., Bottom: 21219 ft.

Wellbore Completed
Completion Date:9/18/2019
Spud Date:6/11/2019Spud Date Is:ACTUAL
Measured TD:21226 ft.Measured PB depth:21200 ft.
True Vertical TD:8379 ft.True Vertical PB depth:8378 ft.
Top PZ Location:Sec:7 Twp: 1S 68WFootage: 2405 FSL  1465 FEL
Bottom Hole Location:Sec:19 Twp: 1S 68WFootage: 505 FSL  1517 FEL
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1596 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1598 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21215 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3497, Top: 2320 ft., Bottom: 21226 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4667 ft.NN
SUSSEX5039 ft.NN
SHANNON5593 ft.NN
SHARON SPRINGS7915 ft.NN
NIOBRARA7925 ft.NN
FORT HAYS8389 ft.NN
CODELL8449 ft.NN
CARLILE8495 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/18/2020                 Interval Top: 9625 ft.    Interval Bottom: 20080 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/16/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Perforated Intervals: 9625'-9652'; 12073'-12207'; 13166'-13475'; 15848'-16032'; 19906'-20080'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9625 ft.# Of Holes:107
Interval Bottom:20080 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 9158 ft.    Interval Bottom: 21187 ft.

 Completed Information for Formation CODELL
1st Production Date:4/16/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Perforated Intervals: 9158'-9599'; 9674'-12049'; 12208'-13130'; 13499'-15824'; 16033'-19882'; 20104'-21187'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9158 ft.# Of Holes:1289
Interval Bottom:21187 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 8776 ft.    Interval Bottom: 9134 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/16/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Perforated Interval: 8776'-9134'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8776 ft.# Of Holes:45
Interval Bottom:9134 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 8/1/2023                  Interval Top: 8776 ft.    Interval Bottom: 21187 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/16/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with a 49-stage plug-and-perf; 183319 total bbls fluid pumped: 165314 bbls gelled fluid and 18005 bbls fresh water (no acid); 9188110 total lbs proppant pumped: all 30/50 mesh sand.
Total fluid used in treatment (bbls):183319Max pressure during treatment (psi):8975
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):20508
Fresh water used in treatment (bbls):18005Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9188110Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 283
BBLS_OIL 655
BTU_GAS 1390
CALC_BBLS_H2O 283
CALC_BBLS_OIL 655
CALC_GOR 2583
CALC_MCF_GAS 1692
CASING_PRESS 2385
GRAVITY_OIL 52
MCF_GAS 1692
TUBING_PRESS 2681
Perforation Data:
Interval Top:8776 ft.# Of Holes:1441
Interval Bottom:21187 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)17359
Total Gas Produced (MCF)199811
GOR11510
GOR DeterminationBOE
Average BOE per Day141.943
Average MCFE per Day823.303

 Federal Financial Assurance  i 

 Tribal Well  i No