Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-014-20749
Well Classification: OW Status: PR - 8/1/2023
Well Name/No:Livingston #S19-25-11C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2023
FacilityID:455307LocationID:455317
Municipality/County:BROOMFIELD / BROOMFIELD #014Location:NWSE 7 1S68W 6
Field:WATTENBERG - #90750Elevation:5324 ft.
Planned Location:2331FSL  1348 FELLat/Long: 39.978561 / -105.039480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.978563 / -105.039478Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/9/2020
End Date: 1/17/2020
Reported: 1/27/2020
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/1/2023             Measured TD: 21226 ft.    Vertical TD: 8379 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/31/2020
Prop Depth/Form:21219 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-2274 , Unit Acreage: 1600, Drill Unit: 7: S/2, 18 & 19: ALL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21219 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2873, Top: 1500 ft., Bottom: 21219 ft.

Wellbore Completed
Completion Date:9/18/2019
Spud Date:6/11/2019Spud Date Is:ACTUAL
Measured TD:21226 ft.Measured PB depth:21200 ft.
True Vertical TD:8379 ft.True Vertical PB depth:8378 ft.
Top PZ Location:Sec:7 Twp: 1S 68WFootage: 2405 FSL  1465 FELDepth
Bottom Hole Location:Sec:19 Twp: 1S 68WFootage: 505 FSL  1517 FELDepth
Log Types:CBL, Mud Log, MWD/LWD, (Resistivity on 014-20753).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1596 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 525, Top: 0 ft., Bottom: 1598 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 21215 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3497, Top: 2320 ft., Bottom: 21226 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4667 ft.NN
SUSSEX5039 ft.NN
SHANNON5593 ft.NN
SHARON SPRINGS7915 ft.NN
NIOBRARA7925 ft.NN
FORT HAYS8389 ft.NN
CODELL8449 ft.NN
CARLILE8495 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 5/18/2020                 Interval Top: 9625 ft.    Interval Bottom: 20080 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:4/16/2020Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Perforated Intervals: 9625'-9652'; 12073'-12207'; 13166'-13475'; 15848'-16032'; 19906'-20080'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9625 ft.# Of Holes:107
Interval Bottom:20080 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 9158 ft.    Interval Bottom: 21187 ft.

 Completed Information for Formation CODELL
1st Production Date:4/16/2020Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Perforated Intervals: 9158'-9599'; 9674'-12049'; 12208'-13130'; 13499'-15824'; 16033'-19882'; 20104'-21187'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9158 ft.# Of Holes:1289
Interval Bottom:21187 ft.Hole Size:0.38 in.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 5/18/2020                 Interval Top: 8776 ft.    Interval Bottom: 9134 ft.

 Completed Information for Formation CARLILE
1st Production Date:4/16/2020Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Perforated Interval: 8776'-9134'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8776 ft.# Of Holes:45
Interval Bottom:9134 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 8/1/2023                  Interval Top: 8776 ft.    Interval Bottom: 21187 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:4/16/2020Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/9/2020Treatment End Date:1/17/2020
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with a 49-stage plug-and-perf; 183319 total bbls fluid pumped: 165314 bbls gelled fluid and 18005 bbls fresh water (no acid); 9188110 total lbs proppant pumped: all 30/50 mesh sand.
Total fluid used in treatment (bbls):183319Max pressure during treatment (psi):8975
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):20508
Fresh water used in treatment (bbls):18005Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9188110Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8757 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/27/2020Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 283
BBLS_OIL 655
BTU_GAS 1390
CALC_BBLS_H2O 283
CALC_BBLS_OIL 655
CALC_GOR 2583
CALC_MCF_GAS 1692
CASING_PRESS 2385
GRAVITY_OIL 52
MCF_GAS 1692
TUBING_PRESS 2681
Perforation Data:
Interval Top:8776 ft.# Of Holes:1441
Interval Bottom:21187 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2023 - August 2024i
Total Oil Produced (Barrels)28225
Total Gas Produced (MCF)259589
GOR9197
GOR DeterminationBOE
Average BOE per Day199.487
Average MCFE per Day1157.012

 Federal Financial Assurance  i 

 Tribal Well  i No