Wellbore #00 Wellbore Classification: GW Status: PA - 10/29/2017 Measured TD: 8690 ft. Vertical TD: 8532 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/29/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/16/2012 | | Proposed Top PZ Location: | Sec:27 Twp: 1N 68W | Footage: 1325 62 | | Bottom Hole Location: | Sec:27 Twp: 1N 68W | Footage: 1312 54 | | Proposed Depth/Form: | 8676 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 470, Top: 0 ft., Bottom: 1090 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8676 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 7454 ft., Bottom: 8676 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/2/2010 | | Spud Date: | 11/24/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8690 ft. | Measured PB depth: | 8615 ft. | | True Vertical TD: | 8532 ft. | True Vertical PB depth: | 8457 ft. | | Top PZ Location: | Sec:27 Twp: 1N 68W | Footage: 1325 FNL 62 FEL | | Bottom Hole Location: | Sec:27 Twp: 1N 68W | Footage: 1312 FNL 54 FEL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1144 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 420, Top: 0 ft., Bottom: 1144 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8671 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 723, Top: 4015 ft., Bottom: 8671 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4972 ft. | | | | | NIOBRARA | 7676 ft. | | | | | CODELL | 8100 ft. | | | | | J SAND | 8554 ft. | | | |
Formation JSND Formation Classification: Status: AB - 10/29/2017 Interval Top: 8554 ft. Interval Bottom: 8570 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/15/2010 | | Treatment Summary: | J SAND COMPLETION
FRAC'D THE J-SAND WITH 153,930 GAL 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,360# 20/40 SAND. 12-15-10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8554 ft. | # Of Holes: | 32 | | Interval Bottom: | 8570 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: Status: CM - 12/25/2010 Interval Top: 7676 ft. Interval Bottom: 8570 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/25/2010 | | Treatment Summary: | JSND-CDL-NBRR COMMINGLE
SET CBP@7620', 01-13-11 DRILLED OUT CBP@ 7620', CFP @ 7990' AND 8200 TO COMMINGLE THE JSND-CDL-NBR. 01-14-11. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8546 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/25/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 63 | | BBLS_OIL | 68 | | BTU_GAS | 1212 | | CALC_BBLS_H2O | 63 | | CALC_BBLS_OIL | 65 | | CALC_GOR | 1938 | | CALC_MCF_GAS | 126 | | CASING_PRESS | 714 | | GRAVITY_OIL | 52 | | MCF_GAS | 126 |
| | Perforation Data: | | Interval Top: | 7676 ft. | # Of Holes: | 268 | | Interval Bottom: | 8570 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: Status: AB - 10/29/2017 Interval Top: 7676 ft. Interval Bottom: 8118 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/15/2010 | | Treatment Summary: | CDL-NBRR COMPLETION
SET CFP@8500', 12-15-10 FRAC'D THE CODELL WITH 108,780 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,120# 20/40 SNAD. 12-15-10
SET CFP@7990 12-15-10 FRAC'D THE NIOBRARA WITH 130,284 GALS 18# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,080# 20/40 SAND. 12-15/10 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7676 ft. | # Of Holes: | 236 | | Interval Bottom: | 8118 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/29/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|