COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02)
2582527
06/15/2010
1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (06)
401201101
03/15/2017
Formations should be listed singly on Form 6 Abandonment Reports.
EngineerForm: (06)
401201101
03/15/2017
Prior to initiation of plugging operations, a Bradenhead test shall be performed. If there is 25# or greater present at the beginning of the test call COGCC Engineer for possible sampling requirements. Form 17 shall be submitted within 10 days.
EngineerForm: (06)
401201101
03/15/2017
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) If surface casing shoe plug not circulated to surface then tag plug – must be 230’ or shallower and provide 10 sx plug at the surface (inside and outside of casing). 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 