|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 11/2/2023 Measured TD: 8573 ft. Vertical TD: 8450 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 11/2/2023 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/27/2013 | | Proposed Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 2004 FNL 554 FEL | | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 2004 FNL 554 FEL | | Proposed Depth/Form: | 8533 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1090 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 1090 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8533 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 310, Top: 7358 ft., Bottom: 8533 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5581 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 240, Top: 4583 ft., Bottom: 5581 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/24/2012 | | Spud Date: | 1/18/2012 | Spud Date Is: | ACTUAL | | Measured TD: | 8573 ft. | Measured PB depth: | 8495 ft. | | True Vertical TD: | 8450 ft. | True Vertical PB depth: | 8372 ft. | | Top PZ Location: | Sec:23 Twp: 1N 68W | Footage: 2004 FNL 554 FEL | | Bottom Hole Location: | Sec:23 Twp: 1N 68W | Footage: 2004 FNL 554 FEL | | Log Types: | CBL, Dual Ind/Compensated Density/Compensated Neutron | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1117 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 459, Top: 0 ft., Bottom: 1117 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8558 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 740, Top: 3315 ft., Bottom: 8558 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4819 ft. | | | | | NIOBRARA | 7551 ft. | | | | | CODELL | 7955 ft. | | | | | J SAND | 8398 ft. | | | |
Formation JSND Formation Classification: Status: AB - 11/2/2023 Interval Top: 8405 ft. Interval Bottom: 8430 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 4/3/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/2/2012 | | Treatment Summary: | Frac'd the J-Sand 8405’-8430’, (50 holes)w/ 65,436 gal 18 # pHaser Hybrid cross
linked gel containing 250,000 # 20/40 Sand. 03-02-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8405 ft. | # Of Holes: | 50 | | Interval Bottom: | 8430 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: Status: CM - 8/13/2012 Interval Top: 7955 ft. Interval Bottom: 7975 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/6/2012 | | Treatment Summary: | Set CFP @ 8035'. 03-02-12
Frac'd the Codell 7,955’ – 7,975’ (40 holes) w/ 88,998 gal 22# pHaser Hybrid cross
linked gel containing 253,020 # 30/50 sand. 03-06-12 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7955 ft. | # Of Holes: | 40 | | Interval Bottom: | 7975 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: Status: CM - 4/4/2012 Interval Top: 7553 ft. Interval Bottom: 8430 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/4/2012 | | Treatment Summary: | Set CBP @ 7510'. 03-30-12
Drilled out CBP @ 7510', CFP @ 7810', CFP @ 8035' to commingle the JSND-NBRR-CDL. 03-31-12 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8390 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/4/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 106 | | BBLS_OIL | 150 | | BTU_GAS | 1245 | | CALC_BBLS_H2O | 106 | | CALC_BBLS_OIL | 150 | | CALC_GOR | 1680 | | CALC_MCF_GAS | 252 | | CASING_PRESS | 2188 | | GRAVITY_OIL | 49 | | MCF_GAS | 252 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 7553 ft. | # Of Holes: | 202 | | Interval Bottom: | 8430 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: Status: AB - 11/2/2023 Interval Top: 7553 ft. Interval Bottom: 8430 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/3/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7553 ft. | # Of Holes: | 152 | | Interval Bottom: | 8430 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: Status: CM - 8/13/2012 Interval Top: 7553 ft. Interval Bottom: 7728 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/6/2012 | | Treatment Summary: | Set CFP @ 7810'. 03-06-12
Frac'd the Niobrara 7,553’ – 7,728’ (112 holes), w/ 101,556 gals 18 # pHaser Hybrid cross
linked gel containing 244,260 # 30/50 sand. 03-06-12
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7553 ft. | # Of Holes: | 112 | | Interval Bottom: | 7728 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/02/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|