|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 5/1/2021 Measured TD: 8620 ft. Vertical TD: 8336 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 5/1/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | 20072688 | Expiration Date: | 7/10/2008 | Proposed Top PZ Location: | Sec: Twp: | Footage: 2008 FSL 1999 FEL | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 2008 FSL 1999 FEL | Proposed Depth/Form: | 8578 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E2 | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E2 | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5442 ft., Weight: , Citings Type: PLANNED | Cement: | Sacks: 250, Top: 4410 ft., Bottom: 5442 ft. |
| | |
Wellbore Completed | Completion Date: | 4/24/2008 | Spud Date: | 4/15/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8620 ft. | Measured PB depth: | 8512 ft. | True Vertical TD: | 8336 ft. | True Vertical PB depth: | 8228 ft. | Top PZ Location: | Sec:12 Twp: 1N 69W | Footage: 1983 FSL 2019 FEL | Bottom Hole Location: | Sec:12 Twp: 1N 69W | Footage: 1983 S 2019 E | Log Types: | CBL, | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 450, Top: 0 ft., Bottom: 906 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8605 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 5624 ft., Bottom: 8605 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5624 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 330, Top: 3680 ft., Bottom: 5624 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4572 ft. | | N | N | SHANNON | 5278 ft. | | N | N | NIOBRARA | 7660 ft. | | N | N | CODELL | 8040 ft. | | N | N | J SAND | 8466 ft. | | N | N |
Formation JSND Formation Classification: GW Status: PR - 5/1/2021 Interval Top: 8478 ft. Interval Bottom: 8498 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2008 | Treatment Summary: | 167,874 GAL FRAC FLUID; 242,060# SAND; 12,080 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8478 ft. | # Of Holes: | 80 | Interval Bottom: | 8498 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 6/2/2008 Interval Top: 7808 ft. Interval Bottom: 8498 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 5/15/2008 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8460 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/2/2008 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 93 | BBLS_OIL | 161 | BTU_GAS | 1000 | CALC_BBLS_H2O | 93 | CALC_BBLS_OIL | 161 | CALC_GOR | 2994 | CALC_MCF_GAS | 482 | CASING_PRESS | 1439 | GRAVITY_OIL | 50 | MCF_GAS | 482 | TUBING_PRESS | 773 |
| Perforation Data: | Interval Top: | 7808 ft. | # Of Holes: | 152 | Interval Bottom: | 8498 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: PR - 5/1/2021 Interval Top: 7808 ft. Interval Bottom: 8058 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/2/2008 | Treatment Summary: | FRAC'D CODELL W/113,736 GAL FRAC GEL FLUID; 253,720# SAND; FRAC'D NIOBRARA W/ 168,840 GAL FRAC FLUID; 253,140# SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NB-CD. |
| Perforation Data: | Interval Top: | 7808 ft. | # Of Holes: | 112 | Interval Bottom: | 8058 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 396 |
Total Gas Produced (MCF) | 8338 |
GOR | 21055 |
GOR Determination | MCFE |
Average BOE per Day | 5.010 |
Average MCFE per Day | 29.067 |
Federal Financial Assurance | i | |
|
|