Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07212
Well Classification: OW Status: SI - 1/1/2022
Well Name/No:Cline 4-64 2 #1H
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2022
FacilityID:433755LocationID:433299
County:ARAPAHOE #005Location:SENE 2 4S64W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5586 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1996FNL  265 FELLat/Long: 39.732803 / -104.509206Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.732806 / -104.509206Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/2/2014
End Date: 1/2/2014
Reported: 1/7/2014
Days to report: 5
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2022             Measured TD: 11240 ft.    Vertical TD: 7427 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/30/2015
Proposed Top PZ Location:Sec:2 Twp: 4S 64W Footage: 1975 FNL  870 FEL
Bottom Hole Location:Sec:2 Twp: 4S 64W Footage: 1891 FNL  891 FWL
Proposed Depth/Form:7707 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1890 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 0 ft., Bottom: 1890 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7684 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 1790 ft., Bottom: 7684 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6682 ft., Depth: 11660 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:10/30/2013
Spud Date:10/14/2013Spud Date Is:ACTUAL
Measured TD:11240 ft.Measured PB depth:11230 ft.
True Vertical TD:7427 ft.True Vertical PB depth:7427 ft.
Top PZ Location:Sec:2 Twp: 4S 64WFootage: 1975 FNL  870 FEL
Bottom Hole Location:Sec:2 Twp: 4S 64WFootage: 1891 FNL  891 FWL
Log Types:LWD/GR & Resistivity, CBL, Mud
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1890 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 600, Top: 0 ft., Bottom: 1890 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7703 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 566 ft., Bottom: 7703 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6659 ft., Depth: 11230 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 295, Top: 6659 ft., Bottom: 11230 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
PIERRE A6722 ft.7111 ft.NN
PIERRE B7111 ft.7138 ft.NN
SHARON SPRINGS7138 ft.7210 ft.NN
NIOBRARA7210 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 1/1/2022                  Interval Top: 7779 ft.    Interval Bottom: 11041 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/27/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/26/2013Treatment End Date:1/2/2014
Treatment Summary:Frac 32 stages with 5,855,967 gal (139,428 bbls) fresh water + 6,706,270 lbs sand propant including 1,338,561 lbs 40/70 + 4,829,280 lbs 20/40 + 391,688 20/40CRC + 146,741 100 Mesh.
Total fluid used in treatment (bbls):142522Max pressure during treatment (psi):8971
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:32
Total acid used in treatment (bbls):3095Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):9983
Fresh water used in treatment (bbls):139428Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6706270Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.375 in.Tubing Setting Depth:6643 ft.
Tubing Packer Depth:6598 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/30/2014Test Method:Flow
Hours Tested:24Gas Type:SHALE
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 755
BBLS_OIL 191
BTU_GAS 1432
CALC_BBLS_H2O 755
CALC_BBLS_OIL 191
CALC_GOR 911
CALC_MCF_GAS 174
GRAVITY_OIL 38
MCF_GAS 174
TUBING_PRESS 340
Perforation Data:
Interval Top:7779 ft.# Of Holes:803
Interval Bottom:11041 ft.Hole Size:0.375 in.

Sidetrack #01             Wellbore Classification:              Status: AB - 4/17/2013             Measured TD:

 Wellbore Data for Sidetrack #01Wellbore Classification:         AB - 4/17/2013
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/25/2015
Proposed Top PZ Location:Sec:2 Twp: 4S 64W Footage: 1997 FNL  841 FEL
Bottom Hole Location:Sec:2 Twp: 4S 64W Footage: 1980 FNL  480 FWL
Proposed Depth/Form:11660 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-246 , Unit Acreage: 640, Drill Unit: SENE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 39.7 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1890 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 0 ft., Bottom: 1890 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7684 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 1790 ft., Bottom: 7684 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 6682 ft., Depth: 11660 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
  No formation data to display.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
04/01/2024
Defined Inactive (SI)YLast Production
12/31/2021
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No