| Engineer | Form: (02) 400395683 05/07/2013 | PILOT HOLE 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
FOR LATERAL 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (02) 400395693 05/07/2013 | PILOT HOLE 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
FOR LATERAL 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 400588575 04/14/2014 | 1) The flaring of natural gas shall be allowed in accordance with COGCC Rule 912 for the initial production test period.
2) Notify the local emergency dispatch or the local governmental designee of any natural gas flaring.
3) Submit updated (requests to flare) to COGCC on Form 4’s (Sundry Notices), which discuss whether or not any new gathering systems or increased development of the field have changed pipeline economics such that installation of a new pipeline would be an economically viable option in lieu of continued flaring.
4) The operator is required to obtain and maintain any required air permits from CDPHE.
5)The flare volumes shall be reported by Form 7. |
| Reclamation Specialist | Form: (04) 400883447 09/24/2015 | Approval of the form 4 acknowledges that the COGCC has received this Notice. A field inspection will be performed to evaluate compliance with the reclamation standards. |
| Engineer | Form: (04) 401374268 05/02/2019 | 1) Flaring of natural gas shall comply with COGCC Rule 912.
2) Metered flaring volumes must also be reported on the Operators Report of Monthly
Operations, Form 7.
3) The operator is required to obtain and maintain any required air permits from
CDPHE.
4) Operator will use an enclosed combustion device with a 98% design destruction
efficiency for hydrocarbons. Wells are to be managed so that production volumes do not
exceed combustor capacity.
5) Provide the local emergency dispatch or the local governmental designee prior notice
of natural gas flaring by supplying them with the approved Sundry Notice and all
attachments. If any changes are made regarding this Sundry or the flaring protocol,
local government designee and emergency dispatch are to be notified prior to flaring
when flaring can be reasonably anticipated, or as soon as possible, but in no event
more than two (2) hours after the flaring occurs.
6) This approval is good until June 1, 2019. |
| Engineer | Form: (04) 402575680 02/24/2021 | All gas volumes are to be metered and combusted with a device with a 98% design efficiency for hydrocarbon destruction. The flared volumes are to be reported in the Form 7, Monthly Report of Operations. |
| Engineer | Form: (04) 402575680 02/24/2021 | The approved productivity test is not to exceed 60 calendar days and the well is to be shut in if a gas capture plan or Sundry requesting to continue to produce without infrastructure has not been approved by that time. |
| Engineer | Form: (04) 402719221 02/25/2022 | Operator shall have an approved Gas Capture Plan or have sought and received a variance from the COGCC Commission for continued production without gas infrastructure, prior to January 15, 2022 or wells must be shut in by January 15, 2022. |
| Engineer | Form: (04) 402719221 02/25/2022 | Gas volumes for productivity test not reported on Form7, amend reporting. Production occurred past approved productivity test without subsequent approval. |
| Engineer | Form: (04) 403368534 04/10/2023 | If well is not producing by March 31, 2024, an official MIT will need to be done. |
| Data Entry | Form: (04) 403368534 04/10/2023 | Well has been designated Inactive as of 12/31/2021. Submit a Form 5B, Inactive Well Notice. |
| Engineer | Form: (04) 403667147 03/22/2024 | If well is not producing by March 31, 2025, an official MIT will need to be done.
|
| Engineer | Form: (04) 404006301 12/02/2024 | 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations.
2) Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
|