Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10039
Well Classification: OW Status: PR - 4/1/2023
Well Name/No:PC 1S-66-2928 #20CDH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2023
FacilityID:450052LocationID:450043
County:ADAMS #001Location:NWSW 29 1S66W 6
Field:WATTENBERG - #90750Elevation:5066 ft.
Planned Location:1607FSL  1325 FWLLat/Long: 39.933280 / -104.804200Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.933349 / -104.804199Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/5/2019
End Date: 1/14/2019
Reported: 2/6/2019
Days to report: 23
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2023             Measured TD: 17875 ft.    Vertical TD: 7716 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2023
Wellbore PermitHORIZONTAL
Permit #:Expiration Date:4/21/2019
Proposed Top PZ Location:Sec:29 Twp: 1S 66W Footage: 0 FSL  500 FWL
Bottom Hole Location:Sec:28 Twp: 1S 66W Footage: 0 FSL  500 FEL
Proposed Depth/Form:17940 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 640, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 640, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17940 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2395, Top: 1500 ft., Bottom: 17940 ft.

Wellbore Completed
Completion Date:9/21/2018
Spud Date:8/8/2018Spud Date Is:ACTUAL
Measured TD:17875 ft.Measured PB depth:17870 ft.
True Vertical TD:7716 ft.True Vertical PB depth:7716 ft.
Top PZ Location:Sec:32 Twp: 1S 66WFootage: 10 FNL  524 FWL
Bottom Hole Location:Sec:33 Twp: 1S 66WFootage: 26 N  551 E
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 001-10041).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1633 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1633 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17875 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2840, Top: 115 ft., Bottom: 17875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4736 ft.NN
SUSSEX5137 ft.NN
SHANNON5840 ft.NN
SHARON SPRINGS7671 ft.NN
NIOBRARA7712 ft.NN
FORT HAYS8286 ft.NN
CODELL8394 ft.NN
CARLILE13609 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 4/22/2019                 Interval Top: 13631 ft.    Interval Bottom: 14614 ft.

 Completed Information for Formation CARLILE
1st Production Date:3/11/2019Choke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Perforated Interval: 13631'-14614'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:13631 ft.# Of Holes:120
Interval Bottom:14614 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/22/2019                 Interval Top: 8400 ft.    Interval Bottom: 17703 ft.

 Completed Information for Formation CODELL
1st Production Date:3/11/2019Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Perforated Intervals: 8400'-9207'; 10305'-13608'; 14637'-17703'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8400 ft.# Of Holes:864
Interval Bottom:17703 ft.Hole Size:0.38 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 4/1/2023                  Interval Top: 8352 ft.    Interval Bottom: 17823 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/11/2019Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Frac'd Carlile-Codell-Fort Hays with a 48-stage plug-and-perf; 153767 total bbls fluid pumped: 137793 bbls gelled fluid, 15959 bbls fresh water, and 15 bbls 28% HCl acid; 9552186 total proppant pumped: all 30/50 mesh sand.
Total fluid used in treatment (bbls):153767Max pressure during treatment (psi):8710
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):15Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13214
Fresh water used in treatment (bbls):15959Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9552186Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8283 ft.
Tubing Packer Depth:8267 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/19/2019Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 316
BBLS_OIL 844
BTU_GAS 1485
CALC_BBLS_H2O 316
CALC_BBLS_OIL 844
CALC_GOR 924
CALC_MCF_GAS 780
CASING_PRESS 1107
GRAVITY_OIL 40
MCF_GAS 780
TUBING_PRESS 1517
Perforation Data:
Interval Top:8352 ft.# Of Holes:1129
Interval Bottom:17823 ft.Hole Size:0.38 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 4/22/2019                 Interval Top: 8352 ft.    Interval Bottom: 17823 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:3/11/2019Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/5/2019Treatment End Date:1/14/2019
Treatment Summary:Perforated Intervals: 8352'-8377'; 9228'-10282'; 17726'-17823'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8352 ft.# Of Holes:145
Interval Bottom:17823 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)14697
Total Gas Produced (MCF)66639
GOR4534
GOR DeterminationBOE
Average BOE per Day71.561
Average MCFE per Day415.028

 Federal Financial Assurance  i 

 Tribal Well  i No