|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/14/2018 Measured TD: 8509 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/14/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 19940177 | Expiration Date: | 8/21/1994 | | Proposed Depth/Form: | 8650 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | 5/15/1995 | | Spud Date: | 4/7/1994 | Spud Date Is: | ACTUAL | | Measured TD: | 8509 ft. | Measured PB depth: | 8469 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | CNL, DIL, NGL & CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 304 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 212, Top: 0 ft., Bottom: 304 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8492 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 6753 ft., Bottom: 8492 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5306 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 185, Top: 3804 ft., Bottom: 5310 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1050 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 750 ft., Bottom: 1070 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7304 ft. | | | | | FORT HAYS | 7733 ft. | | | | | CODELL | 7756 ft. | | | | | J SAND | 8178 ft. | | | | | DAKOTA | 8374 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 1/14/2018 Interval Top: 8190 ft. Interval Bottom: 8240 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/15/1995 | | Treatment Summary: | SEE DOCUMENT # 308512 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 19 | | BBLS_OIL | 15 | | CALC_BBLS_H2O | 19 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 20000 | | CALC_MCF_GAS | 300 | | CASING_PRESS | 560 | | MCF_GAS | 300 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | 8190 ft. | # Of Holes: | 200 | | Interval Bottom: | 8240 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 10/24/1995 Interval Top: 7331 ft. Interval Bottom: 8240 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/15/1995 | Choke Size: | 0.281 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/15/1995 | | Treatment Summary: | SEE DOCUMENT # 308512 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8183 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/24/1995 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 13 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 13 | | CALC_GOR | 8538 | | CALC_MCF_GAS | 111 | | CASING_PRESS | 950 | | MCF_GAS | 111 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 7331 ft. | # Of Holes: | | | Interval Bottom: | 8240 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 1/14/2018 Interval Top: 7331 ft. Interval Bottom: 7772 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 5/15/1995 | | Treatment Summary: | SEE DOCUMENT # 308512 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 7 | | BBLS_OIL | 19 | | CALC_BBLS_H2O | 7 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 7263 | | CALC_MCF_GAS | 138 | | CASING_PRESS | 460 | | MCF_GAS | 138 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7331 ft. | # Of Holes: | 14 | | Interval Bottom: | 7772 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/14/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|