|
Chico-Watkins - #485220 Information | Status: AC - 8/28/2024 |
|
Location ID: | 485220 | Location Name/No: | Chico-Watkins/South | Facility Status: | AC | Facility Status Date: | 8/28/2024 | Operator Name: | CRESTONE PEAK RESOURCES OPERATING LLC | Operator Number: | 10633 | Municipality/County: | AURORA / ARAPAHOE - #005 | Location: | Lot 2 30 4S64W | Facility Type: | LOCATION | Lat/Long: | 39.673572 / -104.601773 | Form 2A Document #: | 403173322 | Form 2A Expiration: | 11/2/2028 | OGDP #: | 484799 |
|
Location Inventory | Wells: 9 | Oil Tanks: 6 | Condensate Tanks: 0 | Water Tanks: 2 | Buried Produced Water Vaults: 0 | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 2 | Pump Jacks: 0 | Separators: 13 | Injection Pumps: 0 | Heat-Treaters: 2 | Cavity Pumps: 0 | Gas Compressors: 2 | Gas or Diesel Motors: 0 | Electric Motors: 0 | Electric Generators: 0 | Fuel Tanks: 0 | LACT Unit: 1 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 2 | Flare: 0 | Enclosed Combustion Devices: 0 | Meter/Sales Building: 2 | Pigging Station: 0 | Other: Crestone will trench flowlines in one piping corridor that runs between the drill pad and the separator pad and be placed at 12" centers. These lines will most likely be 2" or 3" fusion bonded SCH160 steel pipe and have proper cathodic protection throughout the run. Crestone will then sweep up with a long radius that will tie off each line to the appropriate separator. All welds on these are 100% x-ray and hydro tested to the API and Manufactures' specs for a class 1500 series flange. Also meets ASME code B31.4. |
|
|
Related Tank Facilities | Sorry, no associated tank facilities could be found. |
|
Related Pits | Sorry, no associated pits could be found. |
|
|
Off-Location Flowlines | Sorry, no off-location flowlines could be found. |
|
Domestic Taps | Sorry, no domestic taps could be found. |
|