Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-005-07546
Well Classification: OW Status: PR - 8/28/2024
Well Name/No:Chico #4-65 25-26 4AH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/28/2024
FacilityID:485419LocationID:485220
Municipality/County:AURORA / ARAPAHOE #005Location:NWSW 30 4S64W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:5767 ft.
Planned Location:2172FSL  490 FWLLat/Long: 39.673188 / -104.601776Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/20/2024
End Date: 5/3/2024
Reported: 6/17/2024
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 8/28/2024             Measured TD: 18015 ft.    Vertical TD: 7912 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 8/28/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:N/A
Proposed Top PZ Location:Sec:25 Twp: 4S 65W Footage: 1100 FSL  330 FEL
Bottom Hole Location:Sec:26 Twp: 4S 65W Footage: 1100 FSL  330 FWL
Proposed Depth/Form:17936 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-1442 , Unit Acreage: 1280, Drill Unit: T4S R65W SEC 25: ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 105, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3230 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1315, Top: 0 ft., Bottom: 3230 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17936 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2828, Top: , Bottom: 17936 ft.

Wellbore Completed
Completion Date:12/27/2023
Spud Date:12/20/2023Spud Date Is:ACTUAL
Measured TD:18015 ft.Measured PB depth:18003 ft.
True Vertical TD:7912 ft.True Vertical PB depth:7912 ft.
Top PZ Location:Sec:25 Twp: 4S 65WFootage: 1136 FSL  464 FEL
Bottom Hole Location:Sec:26 Twp: 4S 65WFootage: 1070 FSL  330 FWL
Log Types:CBL, MWD, (RES 005-07547 and 005-07553)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 100 ft., Weight: 36.95 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3278 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1375, Top: 0 ft., Bottom: 3278 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18003 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2870, Top: 100 ft., Bottom: 18003 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5004 ft.NN
SUSSEX5331 ft.NN
SHANNON6225 ft.NN
SHARON SPRINGS7730 ft.NN
NIOBRARA7852 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 8/28/2024                 Interval Top: 8277 ft.    Interval Bottom: 17929 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/22/2024Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:4/20/2024Treatment End Date:5/3/2024
Treatment Summary:Frac'd Niobrara with 56 stage plug and perf: 11213504 total pounds proppant pumped: 690003 pounds 40/70 mesh; 10523501 pounds 100 mesh; 464908 total bbls fluid pumped: 438301 bbls gelled fluid; 22583 bbls fresh water and 4024 bbls 15% HCl Acid.
Total fluid used in treatment (bbls):464908Max pressure during treatment (psi):9618
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:56
Total acid used in treatment (bbls):4024Min frac gradient (psi/ft):0.87
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):22583Disposition method For flowback:DISPOSAL
Total proppant used (lbs):11213504Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7900 ft.
Tubing Packer Depth:7918 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/28/2024Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 310
BBLS_OIL 449
BTU_GAS 1400
CALC_BBLS_H2O 310
CALC_BBLS_OIL 449
CALC_GOR 987
CALC_MCF_GAS 443
CASING_PRESS 919
GRAVITY_OIL 40
MCF_GAS 443
TUBING_PRESS 1473
Perforation Data:
Interval Top:8277 ft.# Of Holes:2363
Interval Bottom:17929 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)73924
Total Gas Produced (MCF)126437
GOR1710
GOR DeterminationBOE
Average BOE per Day260.848
Average MCFE per Day1512.925

 Federal Financial Assurance  i 

 Tribal Well  i No