| Grizzly Hebron 12 - #448834 Information | Status: AC - 7/1/2025 |
|
| Location ID: | 448834 | Location Name/No: | Grizzly Hebron 12/0881 (Click Location Name for Water Production Data) | | Facility Status: | AC | Facility Status Date: | 7/1/2025 | | Operator Name: | FULCRUM ENERGY OPERATING LLC | Operator Number: | 10805 | | County: | JACKSON - #057 | Location: | NENE 12 7N81W | | Facility Type: | LOCATION | Lat/Long: | 40.598147 / -106.425339 | | Basin: | NORTH PARK BASIN | | | | Form 2A Document #: | 401876228 | Form 2A Expiration: | 12/22/2019 |
|
| Location Inventory | | Wells: 8 | Oil Tanks: 8 | Condensate Tanks: 2 | Water Tanks: 2 | Buried Produced Water Vaults: 0 | | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 0 | | Pump Jacks: 8 | Separators: 8 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | | Gas Compressors: 1 | Gas or Diesel Motors: 2 | Electric Motors: 0 | Electric Generators: 1 | Fuel Tanks: 0 | | LACT Unit: 1 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 4 | Flare: 1 | | Enclosed Combustion Devices: 0 | Meter/Sales Building: 0 | Pigging Station: 0 | | Other: Production facilities such as oil, water and condesate tanks for this location most likely will be located at a central tank battery (several of each are being permitted though to cover a change in plans); therefore, pipelines will transport produced water and oil to the central battery;
All offsite take away pipelines will be 8" or smaller and be at least schedule 40 steel lines and meet API standards;
On location flowlines from wellheads to seperators to tanks (if constructed) will be 4" or smaller and be at least schedule 40 steel lines and meet API standards;
All pipelines will be buried to a minimum 4' below grade. |
|
| |
| Related Tank Facilities | | Sorry, no associated tank facilities could be found. |
|
| Related Pits | | Sorry, no associated pits could be found. |
|
|
| Off-Location Flowlines | | Facility ID: 482595 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC | | Operator Flowline ID: Grizzly/Hebron3-12H to Hebron CTB | Start Location ID: 448834 | Location: SWNE 7 7N 80W | | Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 12/4/2016 |
| | | Facility ID: 482596 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC | | Operator Flowline ID: Grizzly/Hebron3-12H to Hebron CTB | Start Location ID: 448834 | Location: SWNE 7 7N 80W | | Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 12/4/2016 |
| | | Facility ID: 482597 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC | | Operator Flowline ID: Grizzly/Hebron3-12H to Hebron CTB | Start Location ID: 448834 | Location: SWNE 7 7N 80W | | Flowline Type: Production Line | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 12/4/2016 |
| |
|
| Domestic Taps | | Sorry, no domestic taps could be found. |
|