| Off-Location Flowlines |
| Facility ID: 477015 | Operator Name: D90 ENERGY LLC | Status: AC |
| Operator Flowline ID: Hebron18Pad414127 | Start Location ID: 447512 | Location: NWNE 187N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 5/1/2019 |
| |
| Facility ID: 477015 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC |
| Operator Flowline ID: Hebron18Pad414127 | Start Location ID: 447512 | Location: NWNE 187N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 5/1/2019 |
| |
| Facility ID: 480820 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC |
| Operator Flowline ID: Hebron 18 to Big Horn | Start Location ID: 414127 | Location: NENW 177N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 4/20/2018 |
| |
| Facility ID: 480821 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC |
| Operator Flowline ID: Hebron 18 to Big Horn | Start Location ID: 414127 | Location: NENW 177N 80W |
| Flowline Type: Production Line | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 4/20/2018 |
| |
| Facility ID: 477015 | Operator Name: SANDRIDGE EXPLORATION & PRODUCTION LLC | Status: AC |
| Operator Flowline ID: Hebron18Pad414127 | Start Location ID: 447512 | Location: NWNE 187N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 5/1/2019 |
| |