|
BARCLAY - #336198 Information | Status: AC - 3/1/2025 |
|
Location ID: | 336198 | Location Name/No: | BARCLAY/2N-11HZ | Facility Status: | AC | Facility Status Date: | 3/1/2025 | Operator Name: | KERR MCGEE OIL & GAS ONSHORE LP | Operator Number: | 47120 | County: | WELD - #123 | Location: | SWSE 14 2N67W | Facility Type: | LOCATION | Lat/Long: | 40.132650 / -104.855640 | Form 2A Document #: | 400539973 | Form 2A Expiration: | 3/7/2017 |
|
Location Inventory | Wells: 7 | Oil Tanks: 2 | Condensate Tanks: 0 | Water Tanks: 2 | Buried Produced Water Vaults: 0 | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 0 | Pump Jacks: 5 | Separators: 18 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | Gas Compressors: 0 | Gas or Diesel Motors: 0 | Electric Motors: 0 | Electric Generators: 0 | Fuel Tanks: 0 | LACT Unit: 1 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 5 | Flare: 0 | Enclosed Combustion Devices: 0 | Meter/Sales Building: 0 | Pigging Station: 0 | Other: Please see Comments section. Description of pipelines and flow lines does not fit in space provided.
Two 500 barrel skid-mounted frac tanks will be temporarily placed on-site for use of the pre-spud rig only. One tank will store water and the other will store water based mud. |
|
|
Related Tank Facilities | Sorry, no associated tank facilities could be found. |
|
Related Pits | Sorry, no associated pits could be found. |
|
|
Off-Location Flowlines | Facility ID: 475729 | Operator Name: KP KAUFFMAN COMPANY INC | Status: AC | Operator Flowline ID: Devore 1 | Start Location ID: 336198 | Location: NESE 142N 67W | Flowline Type: Wellhead Line | Fluid Type: Multiphase | Pipe Material: Fiberglass | Construction Date: 4/20/1974 |
| |
|
Domestic Taps | Sorry, no domestic taps could be found. |
|