| MV - #334636 Information | Status: AC - 8/1/2020 |
|
| Location ID: | 334636 | Location Name/No: | MV/28-4 (Click Location Name for Water Production Data) | | Facility Status: | AC | Facility Status Date: | 8/1/2020 | | Operator Name: | TEP ROCKY MOUNTAIN LLC | Operator Number: | 96850 | | County: | GARFIELD - #045 | Location: | Lot 5 4 7S96W | | Facility Type: | LOCATION | Lat/Long: | 39.467875 / -108.117708 | | Basin: | PICEANCE BASIN | | | | Form 2A Document #: | 400575205 | Form 2A Expiration: | 7/10/2017 |
|
| Location Inventory | | Wells: 8 | Oil Tanks: 1 | Condensate Tanks: 0 | Water Tanks: 1 | Buried Produced Water Vaults: 0 | | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 0 | | Pump Jacks: 0 | Separators: 9 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | | Gas Compressors: 0 | Gas or Diesel Motors: 0 | Electric Motors: 0 | Electric Generators: 0 | Fuel Tanks: 0 | | LACT Unit: 0 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 1 | Flare: 1 | | Enclosed Combustion Devices: 0 | Meter/Sales Building: 0 | Pigging Station: 0 | | Other: All approved thru previous Form 2A
1 8" buried steel gas line to tie into existing infrastructure in the main Riley Gulch road.
1 4" buried flex steel water line to tie into existing infrastructure in the main Riley Gulch road.
1 10" temporary sruface poly frac water supply line to tie into existing infrastructure.
1 7" temporary surface steel frac line from pad to GM 32-4 or GM 41-4.
Approved thru previous sundry
2” Flex Steel condensate line to the previously approved trench where a new gas and new water line will be installed from the production equipment on the MV 28-4 pad down the access road to the main Riley Gulch road. (Flex Steel is engineered to be useable for oil products.) From here, the condensate line will continue in a new trench down the main Riley Gulch road to tie into a condensate tank on the GM 32-4 pad. This new trench will be dug in the road in-between two existing pipelines. No additional disturbance is expected to be needed. |
|
| |
| Related Tank Facilities | | Sorry, no associated tank facilities could be found. |
|
| Related Pits | | Sorry, no associated pits could be found. |
|
|
| Off-Location Flowlines | | Sorry, no off-location flowlines could be found. |
|
| Domestic Taps | | Sorry, no domestic taps could be found. |
|